8877 Harry Hines Blvd
Dallas, TX 75247
Rooftop solar panels planned for existing commercial building
Two City of Dallas permits indicate rooftop solar panels are being installed on the existing commercial building at 8877 Harry Hines Blvd. The permits were filed November 5 and December 10, 2025.
Summarized from City of Dallas records · updated Dec 10, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 10, 2025
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8877 Harry Hines Blvd
What is being built at 8877 Harry Hines Blvd?
City of Dallas permits indicate rooftop solar panels are being installed on the existing commercial building.
Is a new building planned at 8877 Harry Hines Blvd?
The permits describe rooftop solar panel installation on an existing commercial building, not construction of a new building.
When were the solar permits filed for 8877 Harry Hines Blvd?
The City of Dallas records show filings on November 5 and December 10, 2025.
What is permit COM-SOLAR-25-000029 for?
The City of Dallas solar/PV permit, filed November 5, 2025, describes rooftop solar panel installation on an existing commercial building.
What is permit COM-ELC-25-003554 for?
The City of Dallas commercial electrical permit, filed December 10, 2025, describes rooftop solar panel installation on an existing commercial building.
Also being built nearby
All of 75247- 8915 Harry Hines BlvdOct 12, 2020Install access control at 13 locations · 57 m away
- 9705 Harry Hines Blvd · Momentous Institute - Constantin CenterAug 26, 2025A general lighting project and small demolition · 68 m away
- 2424 Webb Chapel ExtJun 15, 2026Phase 1 – in nwbof a. installation of dpb-1 and dpb-2 and associated disconnects b. installation of feeders to new panelboards c. demolition of 2 ea bays d. installation of disconnects for bay 4, 5, 6, 9, 10, 11, 12, 14 (steam bay) e. installation of branch wiring for disconnects as listed in 1.c. f. installation of conduit and electrical connection between disconnect, control console, and pit 2. phase 2 – in nwbof a. installation of disconnect for bay 15, 16, 17, 18, 19, 21, 22 b. installation of branch wiring for disconnects as listed in 2.a c. installation of conduit and electrical connection between disconnect, control console, and pit · 87 m away
- 8605 Harry Hines BlvdMay 5, 2026Electrical disconnect of elevator shaft · 102 m away
- 8989 Harry Hines BlvdAug 25, 2026Install a 3 ton complete system and one 2 ton complete system · 168 m away
- 9743 Harry Hines BlvdNov 4, 2026Addition to an existing building, creating suite, a, b , c1 1,929sqft · 253 m away
- 2512 Webb Chapel ExtJul 22, 2025Installing 9 light poles /48 sport lights / 3 lights for shaped structure and 3 outlets in the structure / trench for a future sign/ new meter base · 277 m away
- 9751 Harry Hines BlvdJun 11, 2026No work being done, changing light company for parking lot lights · 285 m away
- 9755 Harry Hines Blvd · Cp Di Ios Harry Hines TX LPMay 18, 2026Install power for existing sign · 301 m away
- 9620 Harry Hines Blvd · Racetrac Inc.Jun 5, 2026Demolition, rough in, top out and set customer supplied fixtures of existing space · 307 m away
- 9757 Harry Hines BlvdAug 4, 2025Traffic signal · 310 m away
- 9765 Harry Hines BlvdSep 17, 2025Property is currently vacant and need to transfer electricity into ownership name. no work will be done to the electrical onsite; customer service advised to complete this permit request for a clean and show permit · 347 m away
More solar installs in 75247.