9003 Governors Row
Dallas, TX 75247
Commercial electrical permit filed at 9003 Governors Row
A commercial electrical permit at 9003 Governors Row is described as “Clean and show.” The City of Dallas record was filed on April 16, 2026, and does not specify a building size or broader project scope.
Summarized from City of Dallas records · updated Apr 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 16, 2026
- since Oct 9, 2020
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 9003 Governors Row
What is being built at 9003 Governors Row?
A City of Dallas commercial electrical permit describes the work as “Clean and show.” The record does not specify a new building or provide more detail about the work.
When was the permit filed for 9003 Governors Row?
The permit was filed on April 16, 2026.
What type of permit was issued at 9003 Governors Row?
The record lists a Commercial Electrical Permit, number COM-ELC-26-001557.
Is there a new building planned at 9003 Governors Row?
The available record is for a commercial electrical permit and does not indicate that a new building is planned.
What is happening near the Avis Budget Group / Waymo Maintenance Facility?
At 9003 Governors Row, about 149 meters from the facility, a City of Dallas commercial electrical permit filed April 16, 2026, describes the work as “Clean and show.” The record does not indicate a connection between the two sites.
Also being built nearby
All of 75247- 9011 Governors RowJul 8, 2025Install 590' of 6' tall two rail press point iron fence. 1- 6'x20' slide gate, 1- 6'x38' slide gate on vee track. new posts. all fence with black powder coated finish · 12 m away
- 1240 Titan DrJun 23, 2026Gas test only · 48 m away
- 9029 Governors RowApr 9, 20266' black vinyl chain link with 3 strands of barb wire(796')3" dq 40 corner post. 2 3/8" dq 40 line post. 1 5/8" dq 40 top rail. 9ga vinyl coated fabric. 8 1/4" vinyl coated fence ties, 9ga. 9ga vinyl coated hog rings. 9ga tension wire. all corner post and brace post to be set in the ground 24" - 30" in 3500psi concrete dry mix. includes all material and labor.chain link double drive gate - 44'- manual, chain link double drive gate 22'- manual · 55 m away
- 1258 Titan DrOct 24, 2025Installing new roof system over the existing roof system.there are no plans · 63 m away
- 1215 Viceroy DrJul 14, 2026Repair service entrance due to vandalism · 138 m away
- 1255 Viceroy DrJan 20, 2021Installing a fire alarm cellular communicator · 149 m away
- 1208 Viceroy Drive · Cantex Bh Viceroy LLCDec 22, 2025Avis budget group / waymo maintenance facility tenant improvement — renovation/alteration — renovate existing building and site for self-driving taxi maintenance facility to include: level 2 ev chargers, dumpster, vehicle ramps, canopies and guard booths. interior shall include revised office space layout, vehicle lifts, breakroom · 149 m away
- 1208 Viceroy DrSep 2, 2026Electrical for new generator · 149 m away
- 1262 Viceroy DrMar 17, 2026Install receptacles · 154 m away
- 8911 Governors RowAug 26, 2026Cast iron sewer replacement under slab with trench · 173 m away
- 1242 Regal RowJan 14, 2021Upgrade existing fire sprinkler system · 218 m away
- 1141 Regal RowMar 31, 2026Commercial plumbing permit · 259 m away