9130 Viscount Row
Dallas, TX 75247
Water line replacement permitted at 9130 Viscount Row
A water line is being replaced in the yard at 9130 Viscount Row, with excavation of a trench up to 60 feet. The City of Dallas issued the commercial plumbing permit on October 14, 2026.
Summarized from City of Dallas records · updated Oct 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2026
- since Oct 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9130 Viscount Row
What is being built at 9130 Viscount Row?
A City of Dallas permit describes replacement of a water line in the yard, with a trench up to 60 feet long. The permit does not describe a new building.
What work is planned at 9130 Viscount Row in Dallas?
The permitted work is a water line replacement using trench excavation. It is listed under commercial plumbing permit COM-PLM-26-003970.
When was the water line replacement permitted?
The City of Dallas permit was filed on October 14, 2026.
How long will the trench be at 9130 Viscount Row?
The permit description says the trench excavation will be up to 60 feet. It does not specify an exact trench length.
What work is happening near Usg Dallas Plant - Phase 1?
At 9130 Viscount Row, about 519 meters from Usg Dallas Plant - Phase 1, a City of Dallas permit covers replacement of a water line in the yard. The permit was filed October 14, 2026.
Also being built nearby
All of 75247- 9125 Viscount RowNov 18, 2026Exp bu zo addition of one (1) offices identified as qc and two (2) offices adjacent to meeting room and a break room; removal of two (2) doors, openings remain on sw wall. this application updates your record # #9702141062 dated 1997 in support of certificate of occupancy application no. co-26-004207, attached drawings are as purchased on 24-dec-2025 · 16 m away
- 9112 Viscount RowJan 30, 2026Gas test for release · 30 m away
- 9030 Viscount RowJan 13, 2021Install new plumbing · 129 m away
- 9019 Premier RowOct 22, 2026Installed 135 feet of 1 1/4 black iron to bypass the section of piping that was leaking. tied into the 1 1/4 feed and ran all new clevis hangers on beam clamps every five feet feeding two hanging heaters on a new 3/4 feed line to heaters · 169 m away
- 9130 Premier Row · Solkorp LLCApr 15, 2026Install 2 walk in coolers and a blast freezer for food storage · 197 m away
- 320 Regal RowFeb 4, 2026Request a clean and show permit to allow authorized contractors/agents to access the vacant space to clean, remove debris, and prepare the unit for showings (no construction or tenant improvements) · 255 m away
- 9239 Premier RowMar 17, 2026Commercial roof recover. install new 60-mil mule hide tpo single-ply roofing system over the existing flat roof assembly. work includes installation of new pipe flashings and a/c pitch pockets at all roof penetrations and integration with the new membrane system. no structural modifications are included in this scope of work. installation will be completed in accordance with manufacturer specifications and applicable city of dallas building codes. existing roof layers will remain within code-allowed limits · 257 m away
- 256 Regal RowNov 17, 2025Remove and replace tpo roof · 316 m away
- 510 Regal RowMay 26, 2026Replace existing building sewer · 327 m away
- 433 Regal RowSep 17, 2026Replacing 60 ft of 4” pvc sewer line in front parking lot and 40 ft of 4 inch pvc drain line from the roof to the front parking lot. will use a mini ex and backhoe during repair process for backfilling and digging · 338 m away
- 535 Regal RowMar 17, 2026Cleanouts, spot repair in wall · 368 m away
- 8925 Premier RowApr 29, 2026Excavation for sewer line replacement, 10ft · 391 m away