15150 Preston Rd

Dallas, TX 75248

Office expansion and remodeling at 15150 Preston Rd

Permits filed April 17, 2026 indicate an existing tenant at 15150 Preston Rd is expanding into additional space and adding offices. Related permits filed April 17–22 cover electrical work, relocating grills, and a breakroom sink. A separate permit filed September 4, 2025 describes work to demolish and rebuild a retaining wall.

Summarized from City of Dallas records · updated Apr 22, 2026

Projects
6
6 filings
Latest filing
Apr 22, 2026
since Sep 4, 2025
Largest scope
—
Listed value
—

Permit & project history

6 projects
  1. Install breakroom sink at existing locationnew fixtures on final

    Install breakroom sink at existing locationnew fixtures on final

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001542
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Relocate all exiting grills and suppling 5 new grills

    Relocate all exiting grills and suppling 5 new grills

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000963
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electrical remodel installing new lights, outlets and switches

    Electrical remodel installing new lights, outlets and switches

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001681
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Mcr existing tenant will be expanding into additional square footage / new walls to create new offices

    Mcr existing tenant will be expanding into additional square footage / new walls to create new offices

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000879
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Mcr • demolition existing stone wall• carefully dismantle existing stone retaining wall using manual labor and hand tools due to limited access.• haul off debris• remove all demolished stone and associated materials from site.• demolition base footing• excavate and remove existing base footing.• excavate behind wall• dig out 5’ setback behind current wall.• remove and haul off excavated soils.• clean up and prep site for construction.• excavate new base footing• dig 6’ wide flat base at 12” depth across full wall length.• excavate beam• dig continuous beam trench 36” deep along wall base for structural reinforcement.• erect formwork• construct formwork for an 11’ tall retaining wall to contain pour.• install rebar• place #4 rebar at 9” on center both front and back faces.• install #5 rebar in footing beam for structural integrity.• install weep pipes• insert 4” weep pipes spaced every 8’ for proper wall drainage.• gravel drainage zones• wrap gravel in felt fabric around each weep hole, measured per cubic foot.• concrete pour• pour 4000 psi concrete into forms.• strip forms• remove all formwork after curing and clean up worksite.• tie hole patching• patch and seal all tie holes and exposed edges.• backfill with select fill• fill space behind wall with select fill material.• compact in uniform layers to ensure structural support.• top soil layer• apply top 12” with existing native soils, compact and taper to slope away from wall.• seal base edges• apply waterproofing sealant at the wall-to-ground base connection.• site cleanup• full site cleanup and debris removal upon completion

    Mcr • demolition existing stone wall• carefully dismantle existing stone retaining wall using manual labor and hand tools due to limited access.• haul off debris• remove all demolished stone and associated materials from site.• demolition base footing• excavate and remove existing base footing.• excavate behind wall• dig out 5’ setback behind current wall.• remove and haul off excavated soils.• clean up and prep site for construction.• excavate new base footing• dig 6’ wide flat base at 12” depth across full wall length.• excavate beam• dig continuous beam trench 36” deep along wall base for structural reinforcement.• erect formwork• construct formwork for an 11’ tall retaining wall to contain pour.• install rebar• place #4 rebar at 9” on center both front and back faces.• install #5 rebar in footing beam for structural integrity.• install weep pipes• insert 4” weep pipes spaced every 8’ for proper wall drainage.• gravel drainage zones• wrap gravel in felt fabric around each weep hole, measured per cubic foot.• concrete pour• pour 4000 psi concrete into forms.• strip forms• remove all formwork after curing and clean up worksite.• tie hole patching• patch and seal all tie holes and exposed edges.• backfill with select fill• fill space behind wall with select fill material.• compact in uniform layers to ensure structural support.• top soil layer• apply top 12” with existing native soils, compact and taper to slope away from wall.• seal base edges• apply waterproofing sealant at the wall-to-ground base connection.• site cleanup• full site cleanup and debris removal upon completion

    City of Dallas permitCommercial Accessory Structure Permit
    Record
    COM-ACC-25-000117
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Interior remodel for spec suite

    Interior remodel for spec suite

    City of Dallas permitBuilding (BU) Commercial Renovation$45
    Record
    2002031130
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 15150 Preston Rd

What is being built at 15150 Preston Rd?

Permits indicate an existing tenant is expanding into additional space and creating new offices. The alteration permit, COM-ALT-ADD-26-000879, was filed April 17, 2026.

When were permits filed for the office work at 15150 Preston Rd?

The office alteration and electrical permits were filed April 17, 2026. Plumbing and mechanical permits followed on April 22 and April 21, respectively.

What remodeling work is planned at 15150 Preston Rd?

Permit descriptions include new office walls, lights, outlets and switches, relocated grills, and a breakroom sink. They do not identify the tenant by name.

What office work is happening near Snarfs Preston Beltline?

At 15150 Preston Rd, permits filed April 17, 2026 indicate an existing tenant is expanding into additional space and creating offices. The address is about 165 meters from Snarfs Preston Beltline.

Is something being renovated at the L'alliance address on Preston Road?

Permits for 15150 Preston Rd indicate office expansion and interior work, including electrical, mechanical, and plumbing updates. The permit descriptions do not name the tenant.

Was a retaining wall permitted at 15150 Preston Rd?

A permit filed September 4, 2025 describes demolishing an existing stone retaining wall and constructing a replacement wall with a new footing and drainage features.