15755 Terrace Lawn Cir
Dallas, TX 75248
15755 Terrace Lawn Cir: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 15755 Terrace Lawn Cir, Dallas, TX 75248. The most recent, filed January 11, 2021, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Jan 11, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 11, 2021
- since Jan 11, 2021
- Largest scope
- —
- Listed value
- $7
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 15755 Terrace Lawn Cir
What is being built at 15755 Terrace Lawn Cir?
The latest filing (City of Dallas permit 2101113085, January 11, 2021) covers replace or modify existing hvac.
How many permits and filings does 15755 Terrace Lawn Cir have?
2 filings across 2 projects, from January 11, 2021 to January 11, 2021.
How much is the construction at 15755 Terrace Lawn Cir worth?
Permits at this address list about $7 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 15755 Terrace Lawn Cir?
Yes. Nearby filings include 15751 Terrace Lawn Cir (for the installation of 25 rooftop solar panels and 2 batteries, Dec 2, 2025); 15756 Terrace Lawn Cir (for the installation of 47 rooftop solar panels and 3 batteries, Jan 12, 2026); 15744 Terrace Lawn Cir (replace 200a main panel, Mar 3, 2026).
How do I get alerts for new permits at 15755 Terrace Lawn Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 15751 Terrace Lawn CirDec 2, 2025For the installation of 25 rooftop solar panels and 2 batteries · 10 m away
- 15756 Terrace Lawn CirJan 12, 2026For the installation of 47 rooftop solar panels and 3 batteries · 14 m away
- 15744 Terrace Lawn CirMar 3, 2026Replace 200a main panel · 28 m away
- 15741 Terrace Lawn CirOct 26, 2026Full under slab sewer pipe replacement- cancel current half bathroom add on lineoutside - reroute half bathroom to left side ofhouse - customer requested this option.excavation to, re-route / replace (hall bathroom,master bathroom, add on half bathroom, kitchen & washer lineunder home sewer pipes only) of the plumbing sewer drainpipeunder the home only. our plan reroutes the under-slab/homesewer pipe and connects it back into the yard sewer line at the citytap area , effectively replacing the yard sewer line as well, seediagram for tie in location · 35 m away
- 15725 Terrace Lawn CirOct 23, 2026Tunnel under home and replace tub drain line · 65 m away
- 15741 Mapleview CirApr 20, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace (hall bathroom, masterbathroom, kitchen & washer line under home sewer pipes only) ofthe plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well · 68 m away
- 15715 Mapleview CirJul 25, 2025Replace sewer yard line from house to city · 131 m away
- 15705 Mapleview CirOct 2, 2025Home was never inspected, gas inspection is needed, plumber will be onsite · 153 m away
- 7521 La Avenida DrOct 1, 2025To replace x1 40 gal gas water heater in the hallway closet · 159 m away
- 7441 La Bolsa DrOct 28, 2025Mcrbat installation of 22 roof mounted pv solar panels and one battery, disconnect/reconnect needed · 168 m away
- 7611 La Risa DrSep 22, 2020Remodel existing plumbing · 192 m away
- 7405 La Bolsa DrJul 1, 2026Replace electrical meter base · 192 m away