15826 Spring Creek Rd
Dallas, TX 75248
Roof replacement permitted at 15826 Spring Creek Rd
A residential roof replacement at 15826 Spring Creek Rd was permitted on September 9, 2025, according to City of Dallas records. The records also show a sewer relay permit dated October 1, 2020; they do not identify a new building or tenant.
Summarized from City of Dallas records · updated Sep 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 9, 2025
- since Oct 1, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 15826 Spring Creek Rd
What is happening at 15826 Spring Creek Rd in Dallas?
City of Dallas records show a residential roof replacement permit filed September 9, 2025, and an earlier sewer relay permit filed October 1, 2020.
When was the roof replacement permitted at 15826 Spring Creek Rd?
The City of Dallas permit was filed September 9, 2025. Its description says to remove the existing roof and replace it with IKO Cambridge shingles in dual black.
What is permit RES-ROOF-25-000833 for?
The City of Dallas permit, filed September 9, 2025, is for removing the existing roof and replacing it with IKO Cambridge shingles in dual black.
Was there a sewer permit at 15826 Spring Creek Rd?
Yes. City of Dallas permit 2010013027, filed October 1, 2020, is described as a sewer relay.
Is a new building or business opening at 15826 Spring Creek Rd?
The records provided show roof replacement and sewer relay work, but do not identify a new building or business.
Also being built nearby
All of 75248- 15832 Spring Creek RdDec 2, 2025Mcr roof solar- 26 module 10.79kw, line side tap · 8 m away
- 7756 El Pensador DrDec 3, 2025Foundation repair-install 9 pilings · 112 m away
- 7747 La Bolsa DrOct 15, 2025Full under slab sewer pipe replacementexcavation to, re-route / replace (hall bathroom, masterbathroom, a/c condensation drain in front flower bed, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 120 m away
- 7740 El Pensador DrSep 8, 2026Mcr with battery installation of 4.51kw roof-mounted pv system with 11 modules, 1 battery & 225a mpu · 135 m away
- 7755 El Pensador DrNov 13, 2025Replace 4 ton complete · 148 m away
- 15755 El Estado DrSep 22, 2025#15755 gas test · 149 m away
- 7727 La Bolsa DrNov 9, 2026Nsfaa-this project comprises a extensive, high-end interior and exterior overhaul combining structural additions, floor plan reconfigurations, complete gut renovations, and custom architectural finishes to transform the existing home into a modernized two-story residence · 160 m away
- 15809 El Estado DrNov 19, 2025Gas test. gas meter in outback in alley · 161 m away
- 15808 El Estado DrOct 4, 2025Gas test · 161 m away
- 7749 El Pensador DrOct 24, 2025Replace water heater. bring up to code all items · 161 m away
- 7720 El Pensador DrJun 16, 2025Replace 4 ton complete · 168 m away
- 7745 El Pensador DrJan 30, 2026Upgrading electrical service · 170 m away