16209 Havenglen Dr
Dallas, TX 75248
16209 Havenglen Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 16209 Havenglen Dr, Dallas, TX 75248. The most recent, filed July 10, 2025, covers: “Install 50 gal gas water heater in hallway closet”.
Compiled from City of Dallas records · updated Jul 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 10, 2025
- since Jul 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 16209 Havenglen Dr
What is being built at 16209 Havenglen Dr?
The latest filing (City of Dallas permit RES-PLM-25-002296, July 10, 2025) covers install 50 gal gas water heater in hallway closet.
How many permits and filings does 16209 Havenglen Dr have?
1 filing across 1 project, from July 10, 2025 to July 10, 2025.
Is there other construction near 16209 Havenglen Dr?
Yes. Nearby filings include 16221 Havenglen Dr (remove existing roof and install new roof, Nov 30, 2020); 7220 Rustic Valley Dr (gas test, May 14, 2026); 7232 Rustic Valley Dr (repair and or install backflow device, Dec 2, 2020).
How do I get alerts for new permits at 16209 Havenglen Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 16221 Havenglen DrNov 30, 2020Remove existing roof and install new roof · 10 m away
- 7220 Rustic Valley DrMay 14, 2026Gas test · 48 m away
- 7232 Rustic Valley DrDec 2, 2020Repair and or install backflow device · 64 m away
- 7239 Rustic Valley DrNov 26, 2025Solar system with battery · 69 m away
- 7238 Rustic Valley DrNov 18, 2026We are adding 6 piers to the southwest area of the home to lift the foundation · 72 m away
- 7220 Brentfield DrJan 6, 2026Install a 6.800 kw roof mounted pv solar system - 16 panels, a telsa powerwall-3, tesla energy gateway-3, enphase iq gateway. utility shutdown required to install teg between meter and (n) span · 83 m away
- 7207 Brentfield DrJun 23, 2026Sewer repair under the home via tunnel · 85 m away
- 16315 Havenglen DrAug 12, 2026Re route water line via tunnel · 92 m away
- 16321 Havenglen DrJan 19, 2021Foundation repair · 97 m away
- 7227 Brentfield DrNov 17, 2026Rsvp - new sfd · 99 m away
- 7121 Echo Bluff DrOct 14, 2025Replacing 50 gallon gas water heater · 104 m away
- 7109 Echo Bluff DrDec 30, 2020Replace water heater & replace/test gas service · 107 m away