16230 Red Cedar Trl
Dallas, TX 75248
Solar panels and battery storage permitted in Dallas
Dallas permits indicate plans for a 17.48-kW residential solar system, two Tesla Powerwall 3 batteries, and a main panel upgrade at 16230 Red Cedar Trl. The first permit was filed December 22, 2025, and the latest, for a battery installation, was filed March 16, 2026.
Summarized from City of Dallas records · updated Mar 16, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Mar 16, 2026
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsThird party approvedmcr with battery chris balian-installing a 17.48 kw pv solar system, 2 tesla pw3, and a main panel upgrade
Third party approvedmcr with battery chris balian-installing a 17.48 kw pv solar system, 2 tesla pw3, and a main panel upgrade
City of Dallas permitResidential Electrical PermitMcr with battery chris balian-installing a 17.48 kw pv solar system, 2 tesla pw3, and a main panel upgrade
Mcr with battery chris balian-installing a 17.48 kw pv solar system, 2 tesla pw3, and a main panel upgrade
City of Dallas permitResidential Solar/PV Permit
Sources: City of Dallas
Questions about 16230 Red Cedar Trl
What is being built at 16230 Red Cedar Trl?
Dallas permit records indicate a residential solar installation with battery storage and a main panel upgrade. The permits describe a 17.48-kW solar system and two Tesla Powerwall 3 batteries.
Is 16230 Red Cedar Trl getting solar panels?
Yes. A Dallas residential solar permit filed December 22, 2025, describes plans for a 17.48-kW solar PV system.
Are batteries being installed at 16230 Red Cedar Trl?
The permits describe two Tesla Powerwall 3 batteries, and a separate permit filed March 16, 2026, covers a battery installation. That permit is RES-SOLAR-26-000107.
When were permits filed for the solar work at 16230 Red Cedar Trl?
The first permit was filed December 22, 2025, followed by an electrical permit on January 20, 2026, and a solar permit on March 16, 2026.
Is the electrical panel being upgraded at 16230 Red Cedar Trl?
The permit description for the 17.48-kW solar system and two batteries also mentions a main panel upgrade. The electrical permit, RES-ELC-26-000368, was filed January 20, 2026.
Also being built nearby
All of 75248- 16211 Red Cedar TrlApr 15, 202650 gallon gas water heater · 39 m away
- 6415 Barkwood LnFeb 9, 2026New shower · 93 m away
- 16308 Ranchita DrNov 16, 2020Install water heater · 102 m away
- 6427 Barkwood LnJul 6, 2026Whole home filtration system outside with rpz · 107 m away
- 6415 Copper Creek DrNov 3, 2025Panel change out · 123 m away
- 6432 Barkwood LnOct 13, 2026Relocating kitchens sink, relocating 12' of water drain adding kitchen sink · 124 m away
- 6414 Copper Creek DrAug 22, 2025Gas leak repair on yard line · 125 m away
- 6436 Barkwood LnAug 17, 2026Replacing 50 gallon gas water heater · 131 m away
- 6422 Copper Creek DrMay 29, 2026Replace broken pvbc fitting under master bathroom · 139 m away
- 5903 Twin CovesMar 31, 2026We gonna relocate some ducts and move the system due to free, we add some vents in the new frame area · 144 m away
- 5907 Twin CovesMar 19, 2026Gas test + repairs - gas meter locked · 151 m away
- 6435 Copper Creek DrAug 19, 20262 ton complete · 155 m away
More solar installs in 75248.