4912 Meadowcreek Dr
Dallas, TX 75248
HVAC system replacement permitted at 4912 Meadowcreek Dr
A 4-ton gas split-system HVAC replacement was permitted at this residence on April 17, 2026. The City of Dallas permit is RES-MEC-26-001772. A separate permit records foundation repair at the address in 2019.
Summarized from City of Dallas records · updated Apr 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 17, 2026
- since Apr 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4912 Meadowcreek Dr
What work is being done at 4912 Meadowcreek Dr?
A City of Dallas permit describes replacing a 4-ton gas split-system HVAC system. The permit was filed April 17, 2026.
When was the HVAC permit filed for 4912 Meadowcreek Dr?
The permit was filed on April 17, 2026. Its number is RES-MEC-26-001772.
Is 4912 Meadowcreek Dr a new home construction project?
The records provided do not describe new construction. They show an HVAC system replacement in 2026 and foundation repair in 2019.
Was foundation repair permitted at 4912 Meadowcreek Dr?
Yes. A City of Dallas permit dated October 15, 2019, records foundation repair at the address. The permit number is 1910156004.
What is the permit number for work at 4912 Meadowcreek Dr?
The 2026 HVAC replacement permit is RES-MEC-26-001772. The 2019 foundation repair permit is 1910156004.
Also being built nearby
All of 75248- 4914 Meadowcreek DrOct 21, 2020Gas relay or repair with test · 12 m away
- 6601 Coolglen DrDec 2, 2020Install water heater · 15 m away
- 6602 Coolglen DrMar 9, 2026Removal of the existing roofing system down to the roof decking. existing decking will be removed and replaced as necessary to provide a compliant nailable substrate, as the current roof deck does not meet fastening requirements for asphalt shingle installation.new roof decking will be installed in accordance with section r803 – roof sheathing of the 2021 international residential code () to provide an approved structural roof deck capable of properly supporting roofing materials and fasteners.installation of new underlayment, drip edge, flashing components, ventilation components, and architectural asphalt shingles in accordance with section r905.2 – asphalt shingles and manufacturer installation requirements.chimney crickets (saddles) will be framed and installed on chimneys exceeding thirty (30) inches in width as required by section r1003.20 to ensure proper water diversion around chimney structures.all work will be performed in compliance with the 2021 international residential code () as adopted and amended by the city of dallas, and in accordance with manufacturer installation specifications · 22 m away
- 4916 Meadowcreek DrSep 28, 2026Wire a new house · 47 m away
- 4915 Meadowcreek DrApr 10, 202618 combination hybrid piers2 exterior concrete breakout · 49 m away
- 6629 Coolglen DrAug 14, 2026Gas test · 79 m away
- 6608 Robin Willow CtApr 10, 2026Replace damage cast iron pipe under the house with pvc below concrete and sewer line · 89 m away
- 6925 Mill Falls DrNov 10, 2026Sewer replacement yard and under slab · 90 m away
- 6620 Robin Willow CtJul 23, 2025Gas test with meter replease · 95 m away
- 6922 Mill Falls DrMar 24, 2026Gas test and repair · 97 m away
- 6603 Robin Willow CtSep 3, 2025Service upgrade“ · 97 m away
- 6916 Mill Falls DrJul 1, 2025Gas pressure test · 99 m away