5200 Keller Springs Rd
Dallas, TX 75248
Condo interior renovation and residential repairs
City of Dallas permits at 5200 Keller Springs Rd document residential repairs and an interior condo renovation, not a clearly described new building. The records span May 19, 2025, through November 6, 2026; a November 6, 2026, permit describes a new floor plan and electrical, plumbing and HVAC duct work, with no load-bearing walls involved.
Summarized from City of Dallas records · updated Nov 19, 2026
- Projects
- 85
- 85 filings
- Latest filing
- Nov 19, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
85 projectsMcr condo renovation. internal renovation only. new floor plan, no load bearing walls. update electrical, plumbing and hvac ducting
Mcr condo renovation. internal renovation only. new floor plan, no load bearing walls. update electrical, plumbing and hvac ducting
City of Dallas permitCommercial Alteration Addition PermitAdjusting shower valve and head to standard height, installation of a new drain and installation of new shower pan
Adjusting shower valve and head to standard height, installation of a new drain and installation of new shower pan
City of Dallas permitCommercial Plumbing PermitMcr the proposed work consists converting the existing bathtub into a walk-in shower. the work will include: ? removal and disposal of the existing bathtub and surrounding wall tile. ? modification of the plumbing, including adjusting the shower valve and shower head to standard shower height. ? installation of a new shower drain as required. ? construction of a new waterproof shower pan and waterproofing system. ? installation of new wall and floor tile within the shower area. ? installation of a new frameless glass shower enclosure. ? final plumbing trim installation and testing of the new shower for proper operation. the project scope is limited to the interior of the guest bathroom and will not affect any structural components or common building elements. *note : toilet will remain in place, bathroom tile flooring remain the same
Mcr the proposed work consists converting the existing bathtub into a walk-in shower. the work will include: ? removal and disposal of the existing bathtub and surrounding wall tile. ? modification of the plumbing, including adjusting the shower valve and shower head to standard shower height. ? installation of a new shower drain as required. ? construction of a new waterproof shower pan and waterproofing system. ? installation of new wall and floor tile within the shower area. ? installation of a new frameless glass shower enclosure. ? final plumbing trim installation and testing of the new shower for proper operation. the project scope is limited to the interior of the guest bathroom and will not affect any structural components or common building elements. *note : toilet will remain in place, bathroom tile flooring remain the same
City of Dallas permitCommercial Alteration Addition PermitThe proposed work consists converting the existing bathtub into a walk-in shower. the work will include:? removal and disposal of the existing bathtub and surrounding wall tile.? modification of the plumbing, including adjusting the shower valve and shower headto standard shower height.? installation of a new shower drain as required.? construction of a new waterproof shower pan and waterproofing system.? installation of new wall and floor tile within the shower area.? installation of a new frameless glass shower enclosure.? final plumbing trim installation and testing of the new shower for proper operation.the project scope is limited to theinterior of the guest bathroom and will not affect any structural components or commonbuilding elements. *note : toilet will remain in place, bathroom tile flooring remain the same
The proposed work consists converting the existing bathtub into a walk-in shower. the work will include:? removal and disposal of the existing bathtub and surrounding wall tile.? modification of the plumbing, including adjusting the shower valve and shower headto standard shower height.? installation of a new shower drain as required.? construction of a new waterproof shower pan and waterproofing system.? installation of new wall and floor tile within the shower area.? installation of a new frameless glass shower enclosure.? final plumbing trim installation and testing of the new shower for proper operation.the project scope is limited to theinterior of the guest bathroom and will not affect any structural components or commonbuilding elements. *note : toilet will remain in place, bathroom tile flooring remain the same
City of Dallas permitResidential Alteration Addition PermitReplacing the old unit for the property with a 3 ton- american standard silver 16 r-454b air conditioner with silver 5tem4 r-454b air handler
Replacing the old unit for the property with a 3 ton- american standard silver 16 r-454b air conditioner with silver 5tem4 r-454b air handler
City of Dallas permitResidential Mechanical PermitPlanning on leaving existing generator active without separate temp generator. after new gen is installed, we will connect pipes to existing disconnects
Planning on leaving existing generator active without separate temp generator. after new gen is installed, we will connect pipes to existing disconnects
City of Dallas permitCommercial Electrical Permit
+ 45 older projects. See the full history with a free trial.
Sources: City of Dallas
Questions about 5200 Keller Springs Rd
What is being built at 5200 Keller Springs Rd?
Recent City of Dallas permits describe an interior condo renovation and residential repairs, including water-heater replacements. They do not clearly describe a new building.
Is a new apartment building planned at 5200 Keller Springs Rd?
The record categories include an apartment project and demolition, but the available project details do not describe a specific new apartment building.
What renovation was permitted at 5200 Keller Springs Rd?
Permit COM-ALT-ADD-26-002692, filed November 6, 2026, describes an interior condo renovation with a new floor plan and updates to electrical, plumbing and HVAC ducting. The description says there are no load-bearing wall changes.
When were permits filed for work at 5200 Keller Springs Rd?
The records span May 19, 2025, through November 6, 2026. Recent filings include a condo renovation permit on November 6, 2026, and residential plumbing permits for water-heater replacements.
Are water heaters being replaced at 5200 Keller Springs Rd?
Yes. Multiple City of Dallas plumbing permits filed in October and November 2026 describe replacing electric water heaters in residential units.
Also being built nearby
All of 75248- 5150 Keller Springs Road · North Dallas Bank & TrustJun 11, 2026Grand homes design center — renovation/alteration — 2nd generation interior renovation · 97 m away
- 5150 Keller Springs RdJul 28, 2026Electrical remodel · 97 m away
- 16150 Dallas PkwyNov 18, 2025Install 1-rpz 1/2 stainless steel · 160 m away
- 16060 Dallas PkwyMar 19, 2026Gas repair & gas test · 185 m away
- 5300 Keller Springs RdJul 23, 2026Sw141348 - denisonshower pan/valve replacement this is building k unit 1045 · 199 m away
- 16000 N. Dallas Parkway · Bsp Tollway Propco LLCJun 21, 2024Wade trim — renovation/alteration — tenant improvement · 212 m away
- 16000 N. Dallas Pkwy · Bsp Tollway Propco LLCApr 30, 2024Speculative suite 285 — renovation/alteration — renovation to suite 285 · 212 m away
- 16000 Dallas Parkway · Tollway Plaza Owner LPNov 9, 2026Axxess refresh — renovation/alteration — renovation to existing tenant's existing suites · 212 m away
- 16000 Dallas PkwySep 22, 202626.0345 southstate bank reworking existing hvac system · 212 m away
- 5353 Keller Springs RdMar 31, 2026Replace 1” gas riser - left side outside office · 248 m away
- 15950 Dallas PkwyOct 7, 2026Electrical work for remodeling · 253 m away
- 15950 Dallas Parkway 4th · Tollway Plaza SouthJan 2, 20254th floor corridor — renovation/alteration — capital improvements · 253 m away