Full-house remodel permitted at 5706 Club Hill Cir
A full-house remodel is planned at 5706 Club Hill Cir, according to a City of Dallas permit filed September 4, 2025. The work includes updates to the kitchen, bathrooms, bedrooms, living areas, windows, and flooring. Separate permits filed through February 2, 2026, cover electrical, HVAC, and plumbing work.
Summarized from City of Dallas records · updated Feb 2, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Feb 2, 2026
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsKitchen rewiring and electrical panel replacement. add 7 can lights in the house. install gfci plug in the bath. rewire the dryer
Kitchen rewiring and electrical panel replacement. add 7 can lights in the house. install gfci plug in the bath. rewire the dryer
City of Dallas permitResidential Electrical PermitNsfaa-project: full house remodelroom number mapping (for clarity)• future main closet = former bedroom #2• future bedroom #2 = former bedroom #3• future bedroom #3 = former bedroom #5• future bedroom #4 = former bedroom #6• game room = former bedroom #41. exterior• tear out all existing flowerbeds.• trim large limbs on trees as needed.• clean up front yard and re-establish grass where needed.• inspect and repair irrigation system problems.• power wash all exterior surfaces as needed.• repaint all exterior cornice, soffits, fascia, and trim.2. general interior• replace all exterior windows with low-e argon gas units.• replace front entry doors.• replace all flooring throughout.• remove coffer ceilings in foyer, dining room, breakfast room, and main bedroom; install flat ceilings.• prep/paint all walls, ceilings, trim, and doors.• replace all interior doors, trim, and baseboards.• install new lighting where needed.3. main bedroom suite• main bedroom: remove double doors to sunroom and existing window; frame as solid wall. add new door to main closet (converted from former bedroom #2).• main bathroom: full demolition. new cabinets/vanities, tops, tub, shower, tile, plumbing fixtures, lighting, accessories, finishes.• main closet (converted from former bedroom #2): reconfigure space; install closet systems, lighting, flooring, and finishes.• electrical: relocate breaker boxes to exterior wall, if feasible and code-compliant.4. bathrooms• guest bathroom #1 – serves future bedroom #2 (formerly bedroom #3): full demolition. new tub/shower, commode, cabinets/vanity, tops, tile, plumbing fixtures, lighting, finishes.• half bath / guest bath #2 (powder room rework): remove existing vanity. install new vanity and commode. relocate commode into small closet footprint to enlarge room; patch/finish as required.• guest bathroom #3: remove existing shower, vanity, and flooring. new shower, vanity, commode, tile floor, lighting, finishes.5. bedrooms• future bedroom #2 (converted from former bedroom #3): new flooring, windows, interior doors; repaint.• hallway to main bedroom & bedroom #2: new flooring and doors. demolition two existing closets and reconfigure into one larger closet.• future bedroom #4 (converted from former bedroom #6): new windows, doors, flooring, paint.• future bedroom #3 (converted from former bedroom #5): new windows, doors, flooring, lighting.• game room (converted from former bedroom #4): remove all paneling and coffer ceiling. install smooth/flat ceiling, new drywall as needed, paint, new flooring, new windows. convert single door to double doors.6. living areas• living room & sunroom: enlarge opening between rooms (remove wall/expand opening per structure). remove paneling and built-ins; install drywall. new flooring.• dining room: remove coffer ceiling; install flat ceiling. new windows and doors. new flooring.• breakfast room: remove coffer ceiling; install flat ceiling. remove windows; install sliding doors. new flooring, doors, paint.7. kitchen• demolition all cabinets, countertops, and fixtures.• remove portion of wall between kitchen and living room to enlarge opening (per structure).• install new cabinets, countertops, plumbing fixtures, appliances, lighting, and finishes.• new flooring.• ceiling note: evaluate feasibility of raising ceiling after drywall removal; proceed if structurally feasible and approved.8. laundry room• new cabinets and countertops.• add dog-wash station (if feasible).• new tile flooring and finishes.9. garage• prep and paint walls; coat floor.• replace garage doors.• clean and finish
Nsfaa-project: full house remodelroom number mapping (for clarity)• future main closet = former bedroom #2• future bedroom #2 = former bedroom #3• future bedroom #3 = former bedroom #5• future bedroom #4 = former bedroom #6• game room = former bedroom #41. exterior• tear out all existing flowerbeds.• trim large limbs on trees as needed.• clean up front yard and re-establish grass where needed.• inspect and repair irrigation system problems.• power wash all exterior surfaces as needed.• repaint all exterior cornice, soffits, fascia, and trim.2. general interior• replace all exterior windows with low-e argon gas units.• replace front entry doors.• replace all flooring throughout.• remove coffer ceilings in foyer, dining room, breakfast room, and main bedroom; install flat ceilings.• prep/paint all walls, ceilings, trim, and doors.• replace all interior doors, trim, and baseboards.• install new lighting where needed.3. main bedroom suite• main bedroom: remove double doors to sunroom and existing window; frame as solid wall. add new door to main closet (converted from former bedroom #2).• main bathroom: full demolition. new cabinets/vanities, tops, tub, shower, tile, plumbing fixtures, lighting, accessories, finishes.• main closet (converted from former bedroom #2): reconfigure space; install closet systems, lighting, flooring, and finishes.• electrical: relocate breaker boxes to exterior wall, if feasible and code-compliant.4. bathrooms• guest bathroom #1 – serves future bedroom #2 (formerly bedroom #3): full demolition. new tub/shower, commode, cabinets/vanity, tops, tile, plumbing fixtures, lighting, finishes.• half bath / guest bath #2 (powder room rework): remove existing vanity. install new vanity and commode. relocate commode into small closet footprint to enlarge room; patch/finish as required.• guest bathroom #3: remove existing shower, vanity, and flooring. new shower, vanity, commode, tile floor, lighting, finishes.5. bedrooms• future bedroom #2 (converted from former bedroom #3): new flooring, windows, interior doors; repaint.• hallway to main bedroom & bedroom #2: new flooring and doors. demolition two existing closets and reconfigure into one larger closet.• future bedroom #4 (converted from former bedroom #6): new windows, doors, flooring, paint.• future bedroom #3 (converted from former bedroom #5): new windows, doors, flooring, lighting.• game room (converted from former bedroom #4): remove all paneling and coffer ceiling. install smooth/flat ceiling, new drywall as needed, paint, new flooring, new windows. convert single door to double doors.6. living areas• living room & sunroom: enlarge opening between rooms (remove wall/expand opening per structure). remove paneling and built-ins; install drywall. new flooring.• dining room: remove coffer ceiling; install flat ceiling. new windows and doors. new flooring.• breakfast room: remove coffer ceiling; install flat ceiling. remove windows; install sliding doors. new flooring, doors, paint.7. kitchen• demolition all cabinets, countertops, and fixtures.• remove portion of wall between kitchen and living room to enlarge opening (per structure).• install new cabinets, countertops, plumbing fixtures, appliances, lighting, and finishes.• new flooring.• ceiling note: evaluate feasibility of raising ceiling after drywall removal; proceed if structurally feasible and approved.8. laundry room• new cabinets and countertops.• add dog-wash station (if feasible).• new tile flooring and finishes.9. garage• prep and paint walls; coat floor.• replace garage doors.• clean and finish
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 5706 Club Hill Cir
What is being built at 5706 Club Hill Cir?
City of Dallas permits indicate a full-house remodel, not a new building. The plans include renovations to the kitchen, bathrooms, bedrooms, and living areas.
When was the remodel at 5706 Club Hill Cir permitted?
The full-house remodel permit, RES-ALT-ADD-25-000748, was filed September 4, 2025. Additional electrical, HVAC, and plumbing permits were filed from September 2025 through February 2, 2026.
What work is planned for the house?
The permit describes interior and exterior updates, including new flooring and windows, bathroom renovations, kitchen replacement, and changes to room layouts. It also includes work in the garage and yard.
Is a new restaurant opening at 5706 Club Hill Cir?
The records provided do not show a restaurant project at this address. They describe residential remodeling and related plumbing, electrical, and HVAC work.
What permits have been filed for 5706 Club Hill Cir?
The City of Dallas records list four permits: a full-house remodel filed September 4, 2025; electrical work filed September 12; HVAC replacement filed October 3; and a plumbing remodel filed February 2, 2026.
Does the permit list a project cost for 5706 Club Hill Cir?
The records provided do not include a reported valuation or an estimated project cost.
Also being built nearby
All of 75248- 5702 Club Hill CirMay 12, 2025Upgrade electrical service · 5 m away
- 5715 Club Hill CirNov 2, 2026Drain replacement · 16 m away
- 17108 Club Hill DrJan 14, 2026Gas pressure test · 52 m away
- 17115 Club Hill DrJun 25, 2026Customer had gas leak near the water heater. atmos was out and turned off the gas because it was before the shut off valve. technician replaced the leaking fitting · 60 m away
- 5715 Club Oaks DrJul 15, 2025Demolition and replace (2) 15 feet wide approaches from city street to driveway.6 inches thick, #4 rebar, 3500 psi mix. 300-320 sq ft · 106 m away
- 5703 Club Oaks DrJul 24, 2026Nsfaa- remodel with small garage addition · 107 m away
- 17127 Club Hill DrOct 27, 2026Reoof to remove and replace shingles · 110 m away
- 17120 Club Hill DrSep 11, 2025Replace 2 existing hvac units · 120 m away
- 17133 Club Hill DrJan 21, 2021Remodel existing plumbing · 136 m away
- 17126 Club Hill DrOct 13, 2026To replace x1 50 gal gas water heater in the walk in attic · 155 m away
- 6019 Club Oaks DrNov 11, 2025Replace 2 50 gal gas water heaters · 180 m away
- 6011 Club Oaks DrOct 12, 2020Replace or modify existing hvac · 181 m away