5907 Gladeside Ct
Dallas, TX 75248
5907 Gladeside Ct: 1 project on record
City of Dallas lists 1 filing across 1 project at 5907 Gladeside Ct, Dallas, TX 75248. The most recent, filed July 25, 2025, covers: “Install 2 bradford white 100 gallon natural gas water heaters upstairs”.
Compiled from City of Dallas records · updated Jul 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 25, 2025
- since Jul 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5907 Gladeside Ct
What is being built at 5907 Gladeside Ct?
The latest filing (City of Dallas permit RES-PLM-25-002951, July 25, 2025) covers install 2 bradford white 100 gallon natural gas water heaters upstairs.
How many permits and filings does 5907 Gladeside Ct have?
1 filing across 1 project, from July 25, 2025 to July 25, 2025.
Is there other construction near 5907 Gladeside Ct?
Yes. Nearby filings include 5912 Gladeside Ct (wreck and haul off debris from residential structure, Jun 27, 2025); 6001 Jericho Ct (2 ton ac with coil only no ductwork, Aug 31, 2026); 5936 Gladeside Ct (install (1) 50 gal gas water heater in garage closet (change out), Mar 30, 2026).
How do I get alerts for new permits at 5907 Gladeside Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 5912 Gladeside CtJun 27, 2025Wreck and haul off debris from residential structure · 13 m away
- 6001 Jericho CtAug 31, 20262 ton ac with coil only no ductwork · 16 m away
- 5936 Gladeside CtMar 30, 2026Install (1) 50 gal gas water heater in garage closet (change out) · 21 m away
- 6002 Jericho CtSep 4, 2026Install new hvac · 22 m away
- 6014 Jericho CtDec 3, 2025We'll be replacing the full driveway, including the area in front of the garage. we'll also be replacing the approaches. the entirety of the driveway is being replaced to the exact dimensions · 36 m away
- 6002 Kettering CtSep 8, 2025Replace hvac system“ · 77 m away
- 6009 Kettering CtNov 12, 2026Installing 4 units · 90 m away
- 5915 Haraby CtJul 29, 2026Remove/replace clay tile roofing material & roof accessories · 148 m away
- 5909 Haraby CtSep 8, 2025Replace sewer line underneath the house and double clean-outs · 151 m away
- 16433 Ashbourne DrDec 18, 2025Install new gas line shut off valve · 230 m away
- 5912 Steuben CtMar 18, 2026Gas test · 267 m away
- 16434 Ashbourne DrApr 6, 2026Remove and replace 8000 sq ft of composite/synthetic tile roofing · 271 m away