groundranger
Recent · latest filing Feb 2026Residential

6002 Blue Mist Ln

Dallas, TX 75248

Kitchen and bathroom updates permitted at 6002 Blue Mist Ln

City of Dallas permits filed Oct. 16, 2025, Oct. 27, 2025, and Feb. 9, 2026 indicate plumbing and electrical updates inside the residence at 6002 Blue Mist Ln. The work includes kitchen appliance connections and lighting, plus plumbing changes for a freestanding tub, shower, and vanity.

Summarized from City of Dallas records · updated Feb 9, 2026

Projects
3
3 filings
Latest filing
Feb 9, 2026
since Oct 16, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Move tub drain to center for new freestanding tub. tub faucet will be deck mount. move water lines accordingly if needed. *jackhammer neededreplace shower drain - same location.install new shower valve - same location.move vanity plumbing if needed to accommodate for new prefab cabinets. (after disconnect and demolition i will know if this needs to be done and co accordingly.)

    Move tub drain to center for new freestanding tub. tub faucet will be deck mount. move water lines accordingly if needed. *jackhammer neededreplace shower drain - same location.install new shower valve - same location.move vanity plumbing if needed to accommodate for new prefab cabinets. (after disconnect and demolition i will know if this needs to be done and co accordingly.)

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-001492
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Description of work: relocate fridge outlet to accommodate new fridge. add 4 can lights to the kitchen on the existing switch

    Description of work: relocate fridge outlet to accommodate new fridge. add 4 can lights to the kitchen on the existing switch

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-004038
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Relocate icemaker box and add gas line for new range

    Relocate icemaker box and add gas line for new range

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-006160
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6002 Blue Mist Ln

What work is being done at 6002 Blue Mist Ln?

City of Dallas permits indicate kitchen electrical and plumbing updates, along with bathroom plumbing work for a freestanding tub, shower, and vanity.

Is a new home being built at 6002 Blue Mist Ln?

The records describe plumbing and electrical work inside a residence, not new home construction.

What kitchen work was permitted at 6002 Blue Mist Ln?

A permit filed Oct. 16, 2025, covers relocating an icemaker box and adding a gas line for a range. A separate electrical permit filed Oct. 27 covers moving a refrigerator outlet and adding four kitchen lights.

What bathroom work was permitted at 6002 Blue Mist Ln?

A plumbing permit filed Feb. 9, 2026, describes moving the tub drain for a freestanding tub, replacing the shower drain and valve, and potentially moving vanity plumbing. The permit number is RES-PLM-26-001492.

When were permits filed for 6002 Blue Mist Ln?

The three City of Dallas permits were filed Oct. 16, 2025, Oct. 27, 2025, and Feb. 9, 2026.

Also being built nearby

All of 75248

More demolitions in 75248, restaurants in 75248.

Get alerts for 6002 Blue Mist Ln