groundranger
Recent · latest filing Mar 2026Residential

6015 Oakcrest Rd

Dallas, TX 75248

Tesla Powerwall 3 battery installation at 6015 Oakcrest Rd

Permits indicate a Tesla Powerwall 3 battery and related electrical equipment are being installed at this residence. The City of Dallas issued two permits for the work on March 9, 2026.

Summarized from City of Dallas records · updated Mar 9, 2026

Projects
2
2 filings
Latest filing
Mar 9, 2026
since Mar 9, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Mcr (3rd) third party approved pantel, richard joseph pe# 142628w/battery install a tesla powerwall-3, tesla energy gateway-3, tesla remote meter & span panel. electrician controlled shutdown required to install new teg between ecb and new span panel

    Mcr (3rd) third party approved pantel, richard joseph pe# 142628w/battery install a tesla powerwall-3, tesla energy gateway-3, tesla remote meter & span panel. electrician controlled shutdown required to install new teg between ecb and new span panel

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000028
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install a tesla powerwall-3, tesla energy gateway-3, tesla remote meter & span panel. electrician controlled shutdown required to install new teg between ecb and new span panel

    Install a tesla powerwall-3, tesla energy gateway-3, tesla remote meter & span panel. electrician controlled shutdown required to install new teg between ecb and new span panel

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-001332
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6015 Oakcrest Rd

What is being installed at 6015 Oakcrest Rd?

City of Dallas permit records describe installation of a Tesla Powerwall 3, Tesla Energy Gateway 3, remote meter and Span panel. The permits were filed March 9, 2026.

Is a Tesla Powerwall being installed at 6015 Oakcrest Rd in Dallas?

Yes. The description on permits RES-SOLAR-26-000028 and RES-ELC-26-001332 lists a Tesla Powerwall 3 installation.

When were the permits filed for 6015 Oakcrest Rd?

Both City of Dallas permits were filed on March 9, 2026.

What electrical work is planned at 6015 Oakcrest Rd?

The permit descriptions include installing a Tesla Energy Gateway 3, remote meter and Span panel, with an electrician-controlled shutdown required for the work.

Are new solar panels being installed at 6015 Oakcrest Rd?

The records include a residential solar/PV permit, but the descriptions specify a battery and related electrical equipment installation. They do not describe new solar panels.

Also being built nearby

All of 75248
Get alerts for 6015 Oakcrest Rd