50-gallon gas water heater replacement permitted in Dallas
A City of Dallas residential plumbing permit indicates a 50-gallon gas water heater will be replaced in the garage at 6019 Yellow Rock Trl. The permit was filed on August 24, 2026, under permit number RES-PLM-26-008914.
Summarized from City of Dallas records · updated Aug 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 24, 2026
- since Aug 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6019 Yellow Rock Trl
What is being built at 6019 Yellow Rock Trl?
The City of Dallas permit record describes a replacement of a 50-gallon gas water heater in the garage, not a new building. The permit was filed August 24, 2026.
What work was permitted at 6019 Yellow Rock Trl in Dallas?
A residential plumbing permit covers replacing a 50-gallon gas water heater in the garage. The permit number is RES-PLM-26-008914.
When was the water heater replacement permitted?
The City of Dallas filed the permit on August 24, 2026.
Is a new home being built at 6019 Yellow Rock Trl?
The available record is for a residential plumbing permit to replace a water heater. It does not indicate new home construction.
How much will the water heater replacement cost?
The permit record does not list a project valuation or cost estimate.
Also being built nearby
All of 75248- 6015 Yellow Rock TrlJun 25, 2025Replacing the existing fence. keeping the exact same size and location · 6 m away
- 6026 Yellow Rock TrlAug 21, 2026For this job, we returned to the home to complete the necessary repair. upon arrival, we cut an access hole in the wall to access the plumbing. we removed the leaking 1/2-inch copper water line and cut out the other two 1/2-inch water lines.we then brazed one coupling on the cold-water line and installed two 90-degree fittings—one on the hot-water line and one on the cold-water line. the lines were stubbed out and brought upward to make them more accessible. we then soldered the necessary fittings to reconnect the new piping to the existing copper above the slab.after allowing all joints to cool, we turned the water back on to the home and bled the air from the water lines. we checked the water meter, which showed no water usage, confirming that there were no apparent leaks at the time of completion · 18 m away
- 6031 Yellow Rock TrlAug 18, 2025Replace 5 ton coil only · 19 m away
- 6005 Yellow Rock TrlOct 1, 2026Tank water heater replacement · 23 m away
- 6004 Yellow Rock TrlNov 3, 2026Because neighbor hit gas line · 26 m away
- 6026 Black Berry LnSep 2, 2025Cold water repipe · 77 m away
- 6034 Black Berry LnApr 27, 2026Direct swap of the existing electrical panel. existing panel has no main disconnect. new panel will have a main breaker. existing panel is 200a and so is the new one · 80 m away
- 6019 White Rose TrlNov 10, 2026Approximately 15ft tunnel under for sewer line repair. will be replacing cracked fitting · 88 m away
- 6015 White Rose TrlMar 23, 2026Remove and replace roof · 88 m away
- 6023 White Rose TrlNov 3, 2025Foundation repair · 88 m away
- 6019 Black Berry LnSep 17, 2026Total 15ft between two tunnels sewer repairs · 88 m away