6128 Black Berry Ln
Dallas, TX 75248
Sidewalk planned at 6128 Black Berry Ln
A City of Dallas permit indicates that work at 6128 Black Berry Ln will remove two existing front drive approaches and install a sidewalk. The permit was filed on November 13, 2026.
Summarized from City of Dallas records · updated Nov 13, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 13, 2026
- since Nov 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 6128 Black Berry Ln
What is being built at 6128 Black Berry Ln?
A City of Dallas permit covers installing a sidewalk after removing two existing drive approaches at the front of the property.
What work does permit RES-DSW-26-000584 cover?
Permit RES-DSW-26-000584 covers removal of two existing drive approaches and sidewalk installation. It was filed on November 13, 2026.
When was the sidewalk permit filed for 6128 Black Berry Ln?
The City of Dallas filed permit RES-DSW-26-000584 on November 13, 2026.
Is a new home being built at 6128 Black Berry Ln?
The available permit describes work on drive approaches and a sidewalk; it does not indicate that a new home is being built.
Where is the sidewalk work planned in Dallas?
The permit lists 6128 Black Berry Ln, Dallas, TX 75248, and describes work at the front of the property.
Also being built nearby
All of 75248- 6127 Black Berry LnMay 4, 2026Perform gas test and repair any leaks found · 13 m away
- 6123 Black Berry LnOct 24, 2025Installation of a 11.07 kw roof mount pv system with a tesla powerwall 3 battery and a 200a main panel upgrade · 17 m away
- 6135 Black Berry LnJan 5, 2026Reroute sewer line · 17 m away
- 6107 Black Berry LnJul 27, 2026Replace hvac system with 4 ton goodman 2 stage horizontal gas full system; no duct work · 42 m away
- 6123 Yellow Rock TrlNov 13, 2026Demolition of the kitchen, pantry, wet bar and dining room closet down to the studs along with removing the walls between the pantry, wet bar and living room closet. plumbing: relocating plumbing lines for the refrigerator and icemaker, replacing any cast iron above grade with pvc and terminating plumbing at wet bar. run gas line to cooktop · 77 m away
- 6143 Yellow Rock TrlNov 12, 2025Adding five piers on the southeast and southwest corners of the home · 79 m away
- 6115 Yellow Rock TrlJan 27, 2021Replace or modify existing hvac · 80 m away
- 6111 Yellow Rock TrlAug 15, 202550 gallon gas water heater install in garage · 83 m away
- 6103 Yellow Rock TrlMay 12, 2025Water repipe overhead and replacing water heater 50 gal gas · 89 m away
- 6122 Yellow Rock TrlAug 27, 2026Replacement of 1 complete hvac system · 90 m away
- 6140 Yellow Rock TrlAug 21, 2026Replacing 50 gallon gas water heater · 91 m away
- 6138 La Cosa DrDec 11, 2020Upgrade existing electrical service · 93 m away