6220 Campbell Rd
Dallas, TX 75248
Office remodel and repairs at 6220 Campbell Road
Permits indicate a remodel of existing office space at 6220 Campbell Road, including window replacement and an ADA ramp curb modification. Dallas permits filed in September 2025 also cover electrical and plumbing work, and an August 2026 permit covers installation of 12 remedial piers.
Summarized from City of Dallas records · updated Aug 31, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Aug 31, 2026
- since Jul 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projects-remove and replace 4 lavatories at existing location. -remove and replace 4 water closet at existing location.-remove and replace 2 kitchen sinks at existing location
-remove and replace 4 lavatories at existing location. -remove and replace 4 water closet at existing location.-remove and replace 2 kitchen sinks at existing location
City of Dallas permitCommercial Plumbing PermitRemodel of existing office space. includes exterior window replacement and exterior curb modification at ada ramp
Remodel of existing office space. includes exterior window replacement and exterior curb modification at ada ramp
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 6220 Campbell Rd
What is being built at 6220 Campbell Road?
The permits describe a remodel of existing office space and building repairs, not a new building. Work includes window replacement, plumbing and electrical work, and foundation piers.
Is there a new office building planned at 6220 Campbell Road?
The records show a remodel of existing office space, rather than a new office building. The remodel permit, COM-ALT-ADD-25-001132, was filed September 9, 2025.
When was the office remodel at 6220 Campbell Road permitted?
The City of Dallas permit for the existing office-space remodel was filed September 9, 2025. It includes exterior window replacement and a curb modification at an ADA ramp.
What plumbing work is permitted at 6220 Campbell Road?
Two plumbing permits were filed September 19, 2025. They cover sewer work and replacement of four lavatories, four water closets, and two kitchen sinks.
What electrical work is planned at 6220 Campbell Road?
Permit COM-ELC-25-002416, filed September 25, 2025, describes a miscellaneous electrical remodel. Two earlier electrical permits filed July 11, 2025, describe meter releases with no work.
Is foundation work planned at 6220 Campbell Road?
Yes. A City of Dallas commercial foundation repair permit filed August 31, 2026, recommends installing 12 remedial piers.
Is a restaurant opening at 6220 Campbell Road?
The records provided do not identify a restaurant opening. They describe an existing office remodel and repair work.
Also being built nearby
All of 75248- 6220 Cambell Rd · Wolf Law Holdings LLCJul 14, 2025Wolf law — renovation/alteration — minor renovations to 4 suites, combining into 1. new lighting, finishes, doors and millwork
- 6210 Campbell RdMay 11, 2026Replace existing 40-ton package unit with exact same size replacement · 8 m away
- 16819 Preston Bend DrApr 29, 2026Hvac replacement. install 5 ton gas horizontal system · 167 m away
- 16906 Preston Bend DrDec 9, 2025Installing two 50 gallon gas water heaters in garage · 208 m away
- 16914 Preston Bend DrOct 12, 2020Remove existing roof and install new roof · 219 m away
- 16802 Preston Bend DrJun 9, 2026Remove and install new composition roof up to current code. replace gutters and skylight · 224 m away
- 16923 Preston Bend DrOct 9, 2026Atmos turned off gas due to gas leak. scope of workupon inspection, the existing 1 1/4" gas riser is leaking at the connection point to the existing gas poly piping underground. the excavation crew has already exposed the piping in the affected area to allow for the necessary repair.our proposed work will include:* remove and replace the existing 1 1/4" gas riser with a new 1 1/4" gas poly-compatible riser assembly.* make the necessary connection to the existing underground gas poly piping.* perform a pressure test on the gas line from the riser toward the house after the repair is completed.* verify that the repaired connection and accessible gas line are holding pressure and that no additional leaks are present.* once the repair passes testing, coordinate the necessary city of dallas inspection.work to be completed in the morning 10/9/26 · 228 m away
- 6367 Southpoint DrFeb 1, 2026Re-roofing project. timeline of work is 8 hours. work will be completed in one day. b&r will remove all shingles, underlayments, fasteners, and vents and place them in a haul away trailer. we will then put new roofing materials on the roof. underlayment, vents, shingles, and ridge cap shingles. the property will be clean and spotless at the end of the day will all debris taken away from the property · 232 m away
- 16804 Davenport CtJul 6, 2026Electrical work for add/alt · 246 m away
- 16816 Davenport CtJul 27, 2026Repair gas riser where it enters the house · 247 m away
- 6358 Southpoint DrMay 12, 202650 gallon electric water heater on second floor closet replacement · 248 m away
- 16826 Davenport CtAug 3, 2026Gas test to find gas leak and make repair · 250 m away