6423 Redpine Rd
Dallas, TX 75248
6423 Redpine Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 6423 Redpine Rd, Dallas, TX 75248. The most recent, filed January 28, 2021, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Jan 28, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2021
- since Jan 28, 2021
- Largest scope
- —
- Listed value
- $9
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 6423 Redpine Rd
What is being built at 6423 Redpine Rd?
The latest filing (City of Dallas permit 2101286008, January 28, 2021) covers remove existing roof and install new roof.
How many permits and filings does 6423 Redpine Rd have?
1 filing across 1 project, from January 28, 2021 to January 28, 2021.
How much is the construction at 6423 Redpine Rd worth?
Permits at this address list about $9 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6423 Redpine Rd?
Yes. Nearby filings include 6426 Brentfield Dr (install ev charger, Jun 26, 2025); 6422 Brentfield Dr (replace yard water line & shut off valve, Sep 8, 2026); 6504 Brentfield Ct (gas line and test, Sep 4, 2026).
How do I get alerts for new permits at 6423 Redpine Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6426 Brentfield DrJun 26, 2025Install ev charger · 71 m away
- 6422 Brentfield DrSep 8, 2026Replace yard water line & shut off valve · 72 m away
- 6504 Brentfield CtSep 4, 2026Gas line and test · 91 m away
- 6506 Brentfield DrOct 29, 2026Install one 50 gallon gas water heater in hallway closet · 93 m away
- 6514 Brentfield DrJan 26, 2021Foundation repair · 98 m away
- 6526 Brentfield DrJun 9, 2025Mcr installation of a grid tied, roof mounted, solar pv system · 107 m away
- 6409 Redpine RdJun 5, 2025Removal and replacement of 77 linear feet of 6ft tall fence,using cedar lumber.re installation of approximately 30 feet,4ft tall existing retaining wall made of concrete block.fallen blocks will be re installed.fence is on the ground,not on or in the retaining wall.fence will be wood · 115 m away
- 6437 Embers RdOct 6, 2020Install water heater · 118 m away
- 6445 Embers RdJun 3, 2025Hvac replacement · 125 m away
- 6423 Embers RdMay 12, 2026Install gas pipe to supply gas for 2 lamps · 127 m away
- 6428 Embers RdJan 8, 2026Replacing 30ft of gas line in the yard · 133 m away
- 6501 Redpine RdJul 29, 2025Replace 4ton base horizontal gas hvac system · 137 m away