6501 Brook Lake Dr
Dallas, TX 75248
6501 Brook Lake Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 6501 Brook Lake Dr, Dallas, TX 75248. The most recent, filed August 18, 2025, covers: “Replace existing hvac system”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6501 Brook Lake Dr
What is being built at 6501 Brook Lake Dr?
The latest filing (City of Dallas permit RES-MEC-25-002005, August 18, 2025) covers replace existing hvac system.
How many permits and filings does 6501 Brook Lake Dr have?
2 filings across 2 projects, from August 18, 2025 to August 18, 2025.
Is there other construction near 6501 Brook Lake Dr?
Yes. Nearby filings include 6523 Brook Lake Dr (install disconnect and replace 200 amp panel, Mar 2, 2026); 6526 Brook Lake Dr (installing 11 exterior pilings, Jul 11, 2025); 6543 Brook Lake Dr (remove existing roof and install new roof, Nov 11, 2020).
How do I get alerts for new permits at 6501 Brook Lake Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6523 Brook Lake DrMar 2, 2026Install disconnect and replace 200 amp panel · 32 m away
- 6526 Brook Lake DrJul 11, 2025Installing 11 exterior pilings · 41 m away
- 6543 Brook Lake DrNov 11, 2020Remove existing roof and install new roof · 63 m away
- 6551 Brook Lake DrOct 3, 2025Replacing (2) hvac units · 75 m away
- 6510 Copper Creek DrMay 11, 20267 ft tunnel to repair hot side slab leak · 87 m away
- 6501 Laurel Valley RdOct 20, 2025Repairing sewer drains below slab · 95 m away
- 6518 Copper Creek DrAug 25, 2026Replacing 3 ton gas complete system · 96 m away
- 6522 Copper Creek DrMay 14, 2026Re-roof · 101 m away
- 6526 Copper Creek DrMar 9, 2026Water line replacement from meter to house for hot and cold, replacing waterlines inside of structure. all work inside and outside approved · 107 m away
- 6439 Brook Lake DrJul 25, 2025Replacing the coil · 118 m away
- 6438 Copper Creek DrJun 2, 2025Gas test · 142 m away
- 6418 Brook Lake DrSep 10, 2026Scope of work replacing 2 inch cast iron kitchen line and washing machine line along with bathroom & 3”inch building sewer main line 65 ft pf pipe 19,500 · 154 m away