6638 Town Bluff Dr
Dallas, TX 75248
6638 Town Bluff Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6638 Town Bluff Dr, Dallas, TX 75248. The most recent, filed June 27, 2025, covers: “Replace sanitary sewer in yard”.
Compiled from City of Dallas records · updated Jun 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6638 Town Bluff Dr
What is being built at 6638 Town Bluff Dr?
The latest filing (City of Dallas permit RES-PLM-25-001950, June 27, 2025) covers replace sanitary sewer in yard.
How many permits and filings does 6638 Town Bluff Dr have?
1 filing across 1 project, from June 27, 2025 to June 27, 2025.
Is there other construction near 6638 Town Bluff Dr?
Yes. Nearby filings include 6646 Town Bluff Dr (switch out old panel, Jun 30, 2025); 6622 Town Bluff Dr (tap existing 1" gas main above kitchen and install 1" indoor regulator with iso valves. install 70'x1" csst gas supply to left exterior side of house (through soffit) at pool heater location and 24" above grade. install approx 8' of steel pipe horizontal from csst to pool heater inlet, secure csst and steel pipe to brick at 5' intervals. install outdoor 3/4" regulator at piping transition point with isolation valves, Oct 26, 2026); 6615 Town Bluff Dr (gas test, Jan 5, 2021).
How do I get alerts for new permits at 6638 Town Bluff Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6646 Town Bluff DrJun 30, 2025Switch out old panel · 20 m away
- 6622 Town Bluff DrOct 26, 2026Tap existing 1" gas main above kitchen and install 1" indoor regulator with iso valves. install 70'x1" csst gas supply to left exterior side of house (through soffit) at pool heater location and 24" above grade. install approx 8' of steel pipe horizontal from csst to pool heater inlet, secure csst and steel pipe to brick at 5' intervals. install outdoor 3/4" regulator at piping transition point with isolation valves · 40 m away
- 6615 Town Bluff DrJan 5, 2021Gas test · 61 m away
- 6607 Town Bluff DrFeb 9, 2026Service upgrade , and pigtail from aluminum to copper on all switches ,receptacles and lights · 80 m away
- 6639 Leameadow DrNov 13, 2026Gas work for 22kw generator · 81 m away
- 6630 Hunters Ridge DrJun 8, 2026Wire swimming pool · 91 m away
- 6615 Leameadow DrOct 16, 2025200 amp panel and meter base replacement · 92 m away
- 6614 Hunters Ridge DrJan 27, 2021Install lawn sprinkler · 96 m away
- 6654 Leameadow DrMar 6, 2026To replace x 1 50 gal gas water heater in the hallway closet · 96 m away
- 6606 Hunters Ridge DrFeb 25, 2026Gas test + repair - locked gas meter · 103 m away
- 6631 Hunters Ridge DrMay 27, 2026Full rewire per nec and city regulations · 104 m away
- 6623 Hunters Ridge DrFeb 18, 2026Fresh water repipe for lines in home and main line in yard · 104 m away