6901 Flintcove Dr
Dallas, TX 75248
Sewer-line and foundation repairs at 6901 Flintcove Dr
Permits at 6901 Flintcove Dr record residential repair work, not a new building. The latest filing, dated June 13, 2025, covers replacing a PVC sewer line beneath the slab by tunneling; a May 28, 2025 permit covers installing 21 piers.
Summarized from City of Dallas records · updated Jun 13, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 13, 2025
- since Dec 4, 2020
- Largest scope
- —
- Listed value
- $4K
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 6901 Flintcove Dr
What work is permitted at 6901 Flintcove Dr?
City of Dallas records list sewer-line work and foundation repairs at the address. The latest permits were filed May 28 and June 13, 2025.
Is a new building being built at 6901 Flintcove Dr?
The listed permits are for residential sewer and foundation repairs, not new construction.
What does the June 2025 permit cover at 6901 Flintcove Dr?
Permit RES-PLM-25-001442, filed June 13, 2025, describes replacing a PVC sewer line beneath the slab foundation by tunneling.
Are foundation repairs planned at 6901 Flintcove Dr?
A City of Dallas residential foundation repair permit records installation of 21 piers. It was filed May 28, 2025, under permit RES-FDN-25-000094.
When was sewer work first filed at 6901 Flintcove Dr?
The earliest listed filing is dated December 4, 2020. Permit 2012043003 describes sewer relay work.
Also being built nearby
All of 75248- 6916 Flintcove DrJan 22, 2026Remove and replace shingles with gaf n/s charcoal · 57 m away
- 6919 Flintcove DrMay 6, 2026Electrical panel and meter base upgrade · 63 m away
- 6921 Flintcove DrDec 12, 20251 access hole in dirt 5 feet of tunnel to repair existing sewer line · 70 m away
- 6920 Flintcove DrSep 4, 2025Hvac changeout – replace 2 full lennox hvac split systems“ · 71 m away
- 6923 Flintcove DrAug 11, 2025Install 10 concrete pilings to stabilze foundation · 77 m away
- 6922 Flintcove DrJul 28, 2025Condenser, coil , furnace like for like · 78 m away
- 6925 Flintcove DrJul 3, 2025Installed 50 gallon gas water heater in garage closet · 84 m away
- 6924 Flintcove DrOct 2, 2020Install roof mounted solar pv system · 85 m away
- 6928 Flintcove DrSep 5, 2026Access plus 5 ft tunnel to make repair on water line · 98 m away
- 4825 Meadowcreek DrJun 3, 2026Nsfaa remove existing deck and posts that were severely damaged from flooding. install all new posts and framing for newly designed deck layout. framing details include:8 4x4steel posts (.25” thickness) set 4’ deep in 10’x18” concrete piers.these posts will also be supporting the gabled patio cover above deck. 6×6 pressure treated posts for covered deck (set 3’ deep in 8” diameter concrete ), 4x4 pressure treated posts set 8' or less on center, (set 3’ deep in 8” diameter concrete) for remaining deck areas2×8 ledger boards to existing concrete retaining wall. 2 2×8's sandwiched to create a 4×8 for beam support. this beam will-support 2x8 joist. 2×8 joist spaced 16" on center for deck frametrex deck boards for surface area.build covered gable patio cover over new deck. framing details include:5 4x10 steel beams set on 8 4x4 steel posts- welded together. 4x4 steel brackets at each post/ beam intersection- welded together4x4 steel vertical supports welded to steel beams to hold reach beam4x8 cedar reach beam 2x6 white wood rafters set 16” o.c to support new asphalt shingle roofbuild small gable patio cover intersecting into larger gable that attaches to back of house with ledger board 2 2x4 pressure treated boards sandwiched together and attached to house to make 4x8 posts3 4x8 cedar beams that sit on 2 steel posts and 2 cedar posts at house. 2x6 white wood rafters set 16” o.c to support new asphalt shingle roofpine tongue and groove for all ceilingsiron fenceremove existing fence and add on for new deck additions: 2x2 black posts with a 4x4 plate anchor into deck frame 3 feet tall wrought iron fence panels1" top& bottom tubing5/8" vertical picketspowder coated black finish2 self closing walk gate · 108 m away
- 6901 Echo Bluff DrJan 21, 2021Remodel existing plumbing · 113 m away
- 6905 Echo Bluff DrNov 10, 2026Mcr with battery installation of a 14.080 kw residential rooftop solar photovoltaic (pv) system consisting of (32) seg-440-btd 440w solar modules, (2) tesla powerwall 3 battery energy storage systems (11.5 kwh each, 240v, single-phase), and (1) tesla gateway 3. the battery energy storage system will be installed outdoors · 117 m away