7078 Regalview Cir
Dallas, TX 75248
7078 Regalview Cir: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 7078 Regalview Cir, Dallas, TX 75248 since May 20, 2025. The most recent, filed June 3, 2025, covers: “Hvac replacement”.
Compiled from City of Dallas records · updated Jun 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 3, 2025
- since May 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7078 Regalview Cir
What is being built at 7078 Regalview Cir?
The latest filing (City of Dallas permit RES-MEC-25-000510, June 3, 2025) covers hvac replacement.
How many permits and filings does 7078 Regalview Cir have?
2 filings across 2 projects, from May 20, 2025 to June 3, 2025.
Is there other construction near 7078 Regalview Cir?
Yes. Nearby filings include 7087 Regalview Cir (install water heater, Nov 9, 2020); 7063 Regalview Cir (permanent electrical service, Dec 1, 2020); 7061 Regalview Cir (remove all asphalt shingles. remove all layers of ice & water shield as well as all layers of underlayment. install synthetic underlayment. install ice & water shield in all valleys and around all accessories. install 50 year asphalt shingle (32 sq), Aug 7, 2026).
How do I get alerts for new permits at 7078 Regalview Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7087 Regalview CirNov 9, 2020Install water heater · 28 m away
- 7063 Regalview CirDec 1, 2020Permanent electrical service · 53 m away
- 7061 Regalview CirAug 7, 2026Remove all asphalt shingles. remove all layers of ice & water shield as well as all layers of underlayment. install synthetic underlayment. install ice & water shield in all valleys and around all accessories. install 50 year asphalt shingle (32 sq) · 55 m away
- 7027 Regalview CirNov 19, 2020Install water heater · 91 m away
- 15941 Longvista DrSep 5, 2025Replacing all cast iron plumbing under slab by rerouting with sch 40 pvc · 128 m away
- 15921 Longvista DrMay 6, 2026Repair the existing meter base open neutral · 135 m away
- 15916 Meadowvista PlDec 2, 2025Full under slab sewer pipe replacement -excavation to, re-route / replace see diagram (left side sharedbathroom, back middle bathroom, kitchen & washer line underhome sewer pipes only) of the plumbing sewer drain pipe under thehome only. our plan reroutes the under slab sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well · 153 m away
- 15911 Longvista DrJan 9, 2026Replace part of the cast iron with sch 40 pvc under slab · 154 m away
- 16005 Longvista DrMay 5, 2026Electrical for patio · 157 m away
- 15924 Meadow Vista PlSep 28, 2020Remove existing roof and install new roof · 159 m away
- 15905 Longvista DrFeb 10, 2026Move three ducts to the ceiling add 3 exhaust fans · 171 m away
- 15944 Meadowvista PlNov 4, 2026Install 12 piers · 172 m away