7115 Hunters Ridge Dr
Dallas, TX 75248
7115 Hunters Ridge Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7115 Hunters Ridge Dr, Dallas, TX 75248. The most recent, filed September 30, 2020, covers: “Gas test”.
Compiled from City of Dallas records · updated Sep 30, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2020
- since Sep 30, 2020
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 7115 Hunters Ridge Dr
What is being built at 7115 Hunters Ridge Dr?
The latest filing (City of Dallas permit 2009306017, September 30, 2020) covers gas test.
How many permits and filings does 7115 Hunters Ridge Dr have?
1 filing across 1 project, from September 30, 2020 to September 30, 2020.
How much is the construction at 7115 Hunters Ridge Dr worth?
Permits at this address list about $12 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 7115 Hunters Ridge Dr?
Yes. Nearby filings include 7116 Hunters Ridge Dr (remodel existing plumbing, Nov 24, 2020); 7107 Hunters Ridge Dr (50 gallon gas install in hallway closet, Oct 17, 2025); 7131 Hunters Ridge Dr (remove and replace 1 full hvac system, Jun 25, 2025).
How do I get alerts for new permits at 7115 Hunters Ridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7116 Hunters Ridge DrNov 24, 2020Remodel existing plumbing · 13 m away
- 7107 Hunters Ridge DrOct 17, 202550 gallon gas install in hallway closet · 17 m away
- 7131 Hunters Ridge DrJun 25, 2025Remove and replace 1 full hvac system · 34 m away
- 7132 Hunters Ridge DrApr 27, 2026Removing old shingles, inspecting the roof deck, making any necessary repairs, and installing new underlayment and shingles. replacing drip edge, flashing, ridge caps, and ventilation to ensure the roof is fully sealed and up to code. the goal is to restore protection, improve durability, and extend the life of the roof · 40 m away
- 7148 Hunters Ridge DrNov 13, 2025Tunnel 115 feet (east side of the residence), remove cast iron pipe (from master bath to clean outs in front of property), perform hydrostatic test on entire drain system · 73 m away
- 7156 Hunters Ridge DrMay 6, 2026Relocated 200 am service · 90 m away
- 7023 Town Bluff DrAug 20, 2026Install 200a eaton ch 42 space outdoor rated panel relocated from inside closet · 95 m away
- 7131 Roundrock RdSep 1, 2026Water line repair through slab · 104 m away
- 7016 Town Bluff DrSep 19, 2025Water repipe · 106 m away
- 7039 Town Bluff DrNov 6, 2020Install water heater · 107 m away
- 7038 Hunters Ridge DrSep 28, 2020Electrical repairs · 119 m away
- 7147 Roundrock RdDec 29, 2025Kitchen line hot water re-route · 127 m away