7205 Highland Heather Ln
Dallas, TX 75248
Home plumbing and mechanical work permitted in Dallas
City of Dallas permits indicate plumbing repairs and mechanical system work at this home. Plumbing permits were filed February 5 and February 28, 2026, for a master shower pan and a sewer line repair; a full mechanical system installation was permitted July 1, 2026.
Summarized from City of Dallas records · updated Jul 1, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 1, 2026
- since Feb 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSewer break on 2" pvc line serving master lavatory making repair via 5 ft tunnel on left side of home near back
Sewer break on 2" pvc line serving master lavatory making repair via 5 ft tunnel on left side of home near back
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 7205 Highland Heather Ln
What work is being done at 7205 Highland Heather Ln?
City of Dallas records show a master shower pan installation, a sewer line repair, and a full mechanical system installation.
Is a new home being built at 7205 Highland Heather Ln?
The records provided show residential plumbing and mechanical permits for work at the address, not a permit for new home construction.
When were permits filed for work at 7205 Highland Heather Ln?
The earliest listed permit was filed February 5, 2026, and the latest was filed July 1, 2026.
What plumbing work was permitted at this Dallas home?
Permit RES-PLM-26-001402, filed February 5, 2026, covers a master shower pan installation. Permit RES-PLM-26-002283, filed February 28, covers a sewer break repair.
Was a mechanical system replacement permitted at 7205 Highland Heather Ln?
A City of Dallas residential mechanical permit dated July 1, 2026, describes a full system installation. The record does not specify further details.
Also being built nearby
All of 75248- 7215 Highland Heather LnOct 17, 202526 piers · 11 m away
- 7206 Highland Heather LnMar 30, 2026Gas test · 13 m away
- 7210 Highland Heather LnNov 6, 2025Hot and cold water repipe interior · 14 m away
- 7113 Highland Heather LnMar 10, 2026Replace 1- 50 gallon water heater · 85 m away
- 7114 Highland Heather LnOct 1, 2026Install 6 pilings; adjust existing pilings · 91 m away
- 7110 Highland Heather LnOct 9, 2025Electrical for addition · 94 m away
- 7302 Highland Glen TrlAug 25, 2026Installation of 19 piers · 97 m away
- 7309 Highland Glen TrlDec 9, 2025Replace 2x 3 ton complete · 109 m away
- 7305 Highland Glen TrlOct 13, 2026Install 17 total pilings (9 exterior, 2 exterior with concrete breakouts, 6 via tunneling) · 110 m away
- 7301 Highland Glen TrlNov 24, 2025Install 11 exterior piers · 111 m away
- 7318 Highland Glen TrlSep 24, 2026Gas test · 113 m away
- 6950 Mccallum BlvdJun 29, 2026Dsst-pvt montessori academy construction of a 6' high metal entry vestibule/enclosure.location: front building entrance.dimensions: 9' (left return) x 10' (front) x 9' (right return).material: black metalmounting: posts are surface-mounted to the concrete deck with base plates · 127 m away