7237 Alto Caro Dr
Dallas, TX 75248
Foundation repair permitted at 7237 Alto Caro Dr
Foundation repair at the residence was permitted on September 3 and 4, 2025. The two City of Dallas permits describe installing nine steel pipe piers along the house’s exterior perimeter to lift it, as recommended in an engineer’s report.
Summarized from City of Dallas records · updated Sep 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 4, 2025
- since Sep 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstallation of nine (9) steel pipe piers to raise exterior perimeter of the house as recommended by the attachd engineer's report
Installation of nine (9) steel pipe piers to raise exterior perimeter of the house as recommended by the attachd engineer's report
City of Dallas permitResidential Foundation RepairInstalltion of nine (9) steel pipe piers on exterior perimeter of the houseto lift as recommended by the attached engineer's report
Installtion of nine (9) steel pipe piers on exterior perimeter of the houseto lift as recommended by the attached engineer's report
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 7237 Alto Caro Dr
What is being built at 7237 Alto Caro Dr?
City of Dallas permits indicate foundation repair at the residence, involving steel pipe piers along the house’s exterior perimeter.
When was the foundation repair at 7237 Alto Caro Dr permitted?
The City of Dallas records list permits dated September 3 and September 4, 2025.
How many piers are listed in the permits for 7237 Alto Caro Dr?
Each of the two permits describes installing nine steel pipe piers. The records do not establish whether the permits refer to separate work.
What are the permit numbers for work at 7237 Alto Caro Dr?
The City of Dallas permits are RES-FDN-25-000426, dated September 3, 2025, and RES-FDN-25-000434, dated September 4, 2025.
Why are steel pipe piers being installed at 7237 Alto Caro Dr?
The permit descriptions say the piers are intended to lift the house and that the work was recommended in an attached engineer’s report.
Also being built nearby
All of 75248- 7261 Alto Caro DrNov 9, 2026200 amp panel · 66 m away
- 7238 Heathermore DrMar 19, 2026To replace x1 50 gal gas water heater in the garage and x1 40 gal gas water heater in the closet on the first floor · 76 m away
- 15807 Meadow Vista DrOct 20, 2020Install water heater · 82 m away
- 7279 Alto Caro DrJan 25, 2021Gas test · 107 m away
- 15948 Meadowvista PlJul 1, 2025Foundation repair-install 8 pilings and adjust 15 existing pilings · 124 m away
- 15944 Meadowvista PlNov 4, 2026Install 12 piers · 127 m away
- 7206 Clearhaven DrApr 1, 2026Sewer repipe in tunnel, reroute and relay · 133 m away
- 7229 La Bolsa DrNov 25, 2020Plumbing (pl) single family alteration · 133 m away
- 7228 Clearhaven DrAug 4, 2026Tear off existing comp. shingles and re-roof with comp shingles · 139 m away
- 15924 Meadow Vista PlSep 28, 2020Remove existing roof and install new roof · 140 m away
- 15916 Meadowvista PlDec 2, 2025Full under slab sewer pipe replacement -excavation to, re-route / replace see diagram (left side sharedbathroom, back middle bathroom, kitchen & washer line underhome sewer pipes only) of the plumbing sewer drain pipe under thehome only. our plan reroutes the under slab sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well · 145 m away
- 7217 Clearhaven DrOct 29, 20257217 clearhaven replace existing back open air patio, private walkway, and driveway including approach (no row sidewalk) to back alley for 1,168sqft of concrete6 inches deep, with psi =3000, centers=18 inch, rebar size=3/8, and depth of concrete = 6 inch · 146 m away