7405 Foxworth Dr
Dallas, TX 75248
7405 Foxworth Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7405 Foxworth Dr, Dallas, TX 75248. The most recent, filed May 19, 2025, covers: “To replace x1 50 gal gas water heater in the garage”.
Compiled from City of Dallas records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7405 Foxworth Dr
What is being built at 7405 Foxworth Dr?
The latest filing (City of Dallas permit RES-PLM-25-000262, May 19, 2025) covers to replace x1 50 gal gas water heater in the garage.
How many permits and filings does 7405 Foxworth Dr have?
1 filing across 1 project, from May 19, 2025 to May 19, 2025.
Is there other construction near 7405 Foxworth Dr?
Yes. Nearby filings include 7423 Foxworth Dr (electrical remodel for master bathroom suite remodel- remove existing lighting fixtures- electrical rework as required by attached plans- new can lights, fixtures, exhaust fan and plugs and switches per electrical schedule noted on attached plans, Sep 14, 2026); 7422 Foxworth Dr (replace unit 15seer 5 tom unit, Apr 30, 2026); 7429 Foxworth Dr (remodel existing plumbing, Nov 10, 2020).
How do I get alerts for new permits at 7405 Foxworth Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7423 Foxworth DrSep 14, 2026Electrical remodel for master bathroom suite remodel- remove existing lighting fixtures- electrical rework as required by attached plans- new can lights, fixtures, exhaust fan and plugs and switches per electrical schedule noted on attached plans · 30 m away
- 7422 Foxworth DrApr 30, 2026Replace unit 15seer 5 tom unit · 35 m away
- 7429 Foxworth DrNov 10, 2020Remodel existing plumbing · 41 m away
- 7435 Foxworth DrMay 20, 2025Tub to shower conversion with new valve · 51 m away
- 7447 Foxworth DrJun 15, 2026Replacement of cast iron pipe to pvc pipe. 3 access holes 1 twelve feet tunnel to connect toilet, vanity, and shower2 ten feet to connect kitchen drain 3 five feet to connect laundry drainthen trench 95 feet outside to main line to reroute drain pipe · 71 m away
- 7341 Foxworth DrAug 19, 2026Replace 5 ton heatpump complete system · 108 m away
- 7440 La Manga DrNov 9, 2026Replace service panel · 109 m away
- 7410 La Sobrina DrApr 29, 2026Water leak spot repair under slab · 109 m away
- 7416 La Sobrina DrJun 3, 202617.1 seer hz 4 ton prem gas system · 110 m away
- 7422 La Sobrina DrDec 15, 2025Tear off and replace one roof. haul away debris · 113 m away
- 7441 La Manga DrJul 9, 2026Replace condenser, coil and furnace · 119 m away
- 7440 La Sobrina DrMar 25, 20265 ton base gas horizontal system · 125 m away