7407 Arbor Oaks Dr
Dallas, TX 75248
Permit filed to replace a gas water heater
A City of Dallas residential plumbing permit indicates one 50-gallon gas water heater in the garage at 7407 Arbor Oaks Dr is being replaced. The permit was filed March 18, 2026; the record does not describe new construction.
Summarized from City of Dallas records · updated Mar 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 18, 2026
- since Mar 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7407 Arbor Oaks Dr
What is being built at 7407 Arbor Oaks Dr?
The City of Dallas permit is for replacing one 50-gallon gas water heater in the garage, not for a new building.
When was the water heater permit filed at 7407 Arbor Oaks Dr?
The residential plumbing permit was filed March 18, 2026.
What is permit RES-PLM-26-002919 for?
It is a City of Dallas permit to replace one 50-gallon gas water heater in the garage at 7407 Arbor Oaks Dr.
Is a new home being built at 7407 Arbor Oaks Dr?
The available permit record describes a water heater replacement, not construction of a new home.
What kind of permit was filed for 7407 Arbor Oaks Dr?
It is a residential plumbing permit filed with the City of Dallas on March 18, 2026.
Also being built nearby
All of 75248- 7408 Arbor Oaks DrJul 8, 2025Electrical remodel · 13 m away
- 7402 Arbor Oaks DrMar 3, 2026Replace water heater and repair slab leak under house · 14 m away
- 7421 Arbor Oaks DrSep 11, 2026Double check replacement · 21 m away
- 7345 Arbor Oaks DrOct 12, 2020Gas relay or repair with test · 93 m away
- 7339 Arbor Oaks DrNov 3, 2020Remodel existing plumbing · 102 m away
- 7338 Arbor Oaks DrFeb 13, 20267338 arbor oaks install 14 concrete pilings to stabilize foundation · 103 m away
- 7338 Brentfield DrMar 19, 2026Gas test · 112 m away
- 7320 Arbor Oaks DrJan 14, 2026Replacing 40 gallon gas water heater · 130 m away
- 7421 Brentfield DrNov 26, 2025Replace federal pacific panel with a ge 200 amp panel · 131 m away
- 7314 Brentfield DrDec 8, 202550 gallon gas water heater · 134 m away
- 7246 Holyoke DrJan 19, 2026Reroute main building sewer line · 157 m away
- 16556 Meandering WayApr 28, 2026Electrical service for city traffic signal at campbell and meandering way · 161 m away