Recent · latest filing Jun 2026Residential
7419 Tophill Ln
Dallas, TX 75248
Permit to replace a 50-gallon gas water heater
A residential plumbing permit at 7419 Tophill Ln covers replacing one 50-gallon gas water heater in the garage. The City of Dallas permit was filed on June 25, 2026; the record does not describe a new building.
Summarized from City of Dallas records · updated Jun 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 25, 2026
- since Jun 25, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7419 Tophill Ln
What work is planned at 7419 Tophill Ln?
A City of Dallas residential plumbing permit covers replacing one 50-gallon gas water heater in the garage.
When was the water heater permit filed?
The permit was filed on June 25, 2026.
What is the permit number for 7419 Tophill Ln?
The permit number is RES-PLM-26-006576.
Is a new home being built at 7419 Tophill Ln?
The record describes a water heater replacement, not new home construction.
Where will the replacement water heater be installed?
The permit description says the 50-gallon gas water heater is in the garage.
Also being built nearby
All of 75248- 7420 Tophill LnAug 3, 2026Water heater install · 14 m away
- 7425 Tophill LnAug 19, 2026Update grounding system 2 8ft grounding system meter base and disconnectpermits and inspectionsultra surge and lightning protection · 14 m away
- 7411 Tophill LnJul 21, 202560 ft tunnel sewer line repair/replacement · 19 m away
- 7437 Tophill LnJan 6, 2026Cast iron piping replacement under slab · 43 m away
- 7443 Tophill LnDec 10, 2025Replacing a 200 amp meter base, a 200 amp panel, add grounding and surge protection · 57 m away
- 7449 Tophill LnJul 27, 202612 fixtures re pipe under slab house cast iron to pvc also 45 feet of sewer yard line and 130 ft of tunnel · 71 m away
- 7450 Tophill LnJul 9, 2026Replace 50 gal gas wh in attic · 76 m away
- 7444 Lynworth DrOct 20, 20261. make accesses in the kitchen, laundry, master bathroom, hall bathroom and front clean outs and tunnel 130’ to replace the existing cast iron with schedule 40 pvc pipe under the existing slab for the master bathroom and (2) hall bathrooms, ac hub drain, powder room, bar sink, laundry room and kitchen to the double clean outs in front of the house.2. remove (4) water closets to replace flanges and reinstall.3. replace the existing tub drain with a new pvc drain.4. hand dig 30’ from the laundry room to the kitchen from the outside to connect to the kitchen drain to the new drain line.5. anchor plumbing to structural beams as per code · 90 m away
- 7425 Lynworth DrApr 24, 20265 ton deluxe 80% gas system – horizontal · 91 m away
- 7443 Lynworth DrMar 2, 2026Meter base upgrade · 100 m away
- 7403 Chattington DrOct 6, 2025Installed complete hvac system · 113 m away
- 7308 Tangleglen DrJan 21, 2026Complete installation for two a/c systems, gas 5 tons each · 123 m away