7423 Whispering Pines Dr
Dallas, TX 75248
Home gets HVAC replacement and under-slab repiping
City of Dallas permits indicate residential plumbing and mechanical work at 7423 Whispering Pines Dr, not a new building. A plumbing permit filed March 16, 2026, covers repiping under the slab to the city main in the alley; a mechanical permit filed September 3, 2026, covers replacement of the air conditioning and heating system.
Summarized from City of Dallas records · updated Sep 3, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2026
- since Mar 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7423 Whispering Pines Dr
What work is happening at 7423 Whispering Pines Dr?
City of Dallas permits cover under-slab plumbing repiping and replacement of the air conditioning and heating system.
Is a new home being built at 7423 Whispering Pines Dr?
The records provided show residential plumbing and mechanical permits, not a new-home construction permit.
When was the plumbing work permitted at 7423 Whispering Pines Dr?
The plumbing permit, RES-PLM-26-002808, was filed March 16, 2026. It describes repiping under the slab to the city main in the alleyway.
What does the plumbing permit at 7423 Whispering Pines Dr cover?
Permit RES-PLM-26-002808 describes removing cast iron pipe and installing Schedule 40 PVC for a repipe under the slab to the city main in the alleyway.
When was the HVAC replacement permitted at 7423 Whispering Pines Dr?
The mechanical permit, RES-MEC-26-004873, was filed September 3, 2026, for replacement of the air conditioning and heating system.
Also being built nearby
All of 75248- 7417 Whispering Pines DrOct 19, 2026Remove and replace roofing system · 11 m away
- 7422 Whispering Pines DrNov 19, 2020Gas relay or repair with test · 13 m away
- 7416 Whispering Pines DrOct 28, 20265-ton gas level 2 complete system replacement · 17 m away
- 7428 Whispering Pines DrNov 10, 2020Replace or modify existing hvac · 17 m away
- 7411 Whispering Pines DrFeb 17, 2026Shower pan replacement · 21 m away
- 7406 Whispering Pines DrFeb 10, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace (front left bathroom,back left bathroom, right side half bathroom, kitchen & washerline under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 31 m away
- 7422 La Sobrina DrDec 15, 2025Tear off and replace one roof. haul away debris · 84 m away
- 7440 La Sobrina DrMar 25, 20265 ton base gas horizontal system · 85 m away
- 7416 La Sobrina DrJun 3, 202617.1 seer hz 4 ton prem gas system · 86 m away
- 7410 La Sobrina DrApr 29, 2026Water leak spot repair under slab · 89 m away
- 7440 Clearhaven DrSep 15, 2020Install new hvac · 127 m away
- 7446 Clearhaven DrSep 11, 2026Whole house water repipe · 129 m away