7606 Dunleer Way
Dallas, TX 75248
7606 Dunleer Way: 1 project on record
City of Dallas lists 1 filing across 1 project at 7606 Dunleer Way, Dallas, TX 75248. The most recent, filed May 22, 2025, covers: “Install 50 gallon gas water heater”.
Compiled from City of Dallas records · updated May 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 22, 2025
- since May 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7606 Dunleer Way
What is being built at 7606 Dunleer Way?
The latest filing (City of Dallas permit RES-PLM-25-000560, May 22, 2025) covers install 50 gallon gas water heater.
How many permits and filings does 7606 Dunleer Way have?
1 filing across 1 project, from May 22, 2025 to May 22, 2025.
Is there other construction near 7606 Dunleer Way?
Yes. Nearby filings include 7605 Dunleer Way (replace or modify existing hvac, Nov 5, 2020); 7619 Dunleer Way (gas leak fixed, Sep 8, 2026); 16727 Dundrennan Ln (install 16 exterior drilled concrete piers and 2 pilings. relevel slab foundation as per contractor's best judgement and as approved by the engineer, Mar 19, 2026).
How do I get alerts for new permits at 7606 Dunleer Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7605 Dunleer WayNov 5, 2020Replace or modify existing hvac · 13 m away
- 7619 Dunleer WaySep 8, 2026Gas leak fixed · 27 m away
- 16727 Dundrennan LnMar 19, 2026Install 16 exterior drilled concrete piers and 2 pilings. relevel slab foundation as per contractor's best judgement and as approved by the engineer · 34 m away
- 7605 Kevin DrOct 23, 2026Trench 39 feet of sewer pipe and replace · 85 m away
- 7601 Kevin DrJun 29, 2026Replace panel ,meter and adding a disconnect · 86 m away
- 7623 Kevin DrNov 17, 2026Relocate 1 supply diffuser and add two supply vents · 88 m away
- 7606 Kevin DrFeb 6, 2026Installation of 7 double-walled steel piers under slab foundation for repairs · 97 m away
- 7610 Mullrany DrDec 30, 2025Gas test to get gas back on to the house · 100 m away
- 7632 Mullrany DrMar 13, 20254 ton gas complete install · 127 m away
- 7605 Pennyburn DrMar 12, 2026Trench to replace gas yard service and 2 risers · 179 m away
- 7601 Pennyburn DrJan 6, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new 3/4" emt conduit to power the level 2 ev charger at 48amp constant draw · 179 m away
- 7609 Pennyburn DrDec 15, 2025Foundation repair-install 2 steel piers under the home to stabilize the foundation · 179 m away