7705 Scotia Dr
Dallas, TX 75248
7705 Scotia Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7705 Scotia Dr, Dallas, TX 75248. The most recent, filed June 2, 2025, covers: “Install 40 gallon gas water heater in hallway closet (swap out)”.
Compiled from City of Dallas records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7705 Scotia Dr
What is being built at 7705 Scotia Dr?
The latest filing (City of Dallas permit RES-PLM-25-000946, June 2, 2025) covers install 40 gallon gas water heater in hallway closet (swap out).
How many permits and filings does 7705 Scotia Dr have?
1 filing across 1 project, from June 2, 2025 to June 2, 2025.
Is there other construction near 7705 Scotia Dr?
Yes. Nearby filings include 7709 Scotia Dr (replace up to 50' sewer line in front yard, Jan 14, 2026); 16106 Salado Dr (replace only the electrical panel 200a, Nov 30, 2025); 7711 Scotia Dr (sewer reroute under slab, Aug 11, 2025).
How do I get alerts for new permits at 7705 Scotia Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7709 Scotia DrJan 14, 2026Replace up to 50' sewer line in front yard · 10 m away
- 16106 Salado DrNov 30, 2025Replace only the electrical panel 200a · 15 m away
- 7711 Scotia DrAug 11, 2025Sewer reroute under slab · 15 m away
- 7718 Scotia DrJan 12, 2026Install 50 gallon gas water heater in garage closet (swap out) · 36 m away
- 7707 La Cabeza DrFeb 6, 2026Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 97 m away
- 7624 Carta Valley CtMay 26, 2026Replace condenser and coil · 109 m away
- 7622 Carta Valley CtOct 23, 2026Under slab sewer repipe · 109 m away
- 7708 La Cabeza DrJun 10, 2025Full under slab sewer pipe replacementexcavation to, re-route / replace see (left side frontbathroom, left side back bathroom, right side half bathroom,kitchen & washer line under home sewer pipes only) of theplumbing sewer drain pipe under the home only. our plan reroutesthe under slab sewer pipe and connects it back into the yard sewerline at the city tap area , effectively replacing the yard sewer line aswell · 110 m away
- 7620 Carta Valley CtSep 28, 2026Under slab sewer repair · 110 m away
- 7611 Carta Valley DrSep 15, 2020Repair gas line to grill · 117 m away
- 7607 Carta Valley DrNov 9, 2026Install 50 gallon gas water heater in hallway closet (swap out) · 140 m away
- 7727 La Manga DrJun 8, 2026Re-roof. remove existing roof system install new comp shingles · 201 m away