7745 La Verdura Dr
Dallas, TX 75248
Drain lines under Dallas home to be replaced with PVC
A residential plumbing permit filed May 15, 2026, covers replacing the drain lines under the house at 7745 La Verdura Dr. The permit description specifies replacing cast-iron lines with PVC.
Summarized from City of Dallas records · updated May 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2026
- since May 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7745 La Verdura Dr
What work is planned at 7745 La Verdura Dr?
A City of Dallas residential plumbing permit covers replacing all drain lines under the house, changing them from cast iron to PVC.
When was the plumbing permit filed?
The permit was filed on May 15, 2026.
What is the permit number for 7745 La Verdura Dr?
The City of Dallas permit number is RES-PLM-26-005067.
Are the drain lines being replaced with PVC?
Yes. The permit description says the existing cast-iron drain lines under the house will be replaced with PVC.
Is this a new home construction project?
The available record describes a residential plumbing permit for replacing drain lines under the house, not a new-home construction project.
Also being built nearby
All of 75248- 7748 La Verdura DrAug 28, 202550 gallon gas water heater · 18 m away
- 7736 La Verdura DrJul 21, 2026Complete below grade replacement of the sanitary sewer system via crawl space and exterior tunnel · 30 m away
- 7755 La Verdura DrJul 2, 2026Install tub and lavatory faucet · 33 m away
- 7728 La Verdura DrSep 10, 2026Sewer yard line replacement · 55 m away
- 7718 La Verdura DrDec 10, 2025Replacing existing cast iron sewer line with pvc · 88 m away
- 7749 Alto Caro DrMay 15, 2025Gas test confirmation 9002656045 · 95 m away
- 7750 Alto Caro DrDec 29, 2025Replace sewer under pier and beam house and yard · 108 m away
- 7756 Alto Caro DrOct 28, 2026Approx 10 ft tunnel below slab to repair domestic water leak · 113 m away
- 7720 El Pastel DrAug 28, 2025Residential gast test · 114 m away
- 7725 Alto Caro DrMay 5, 2026Replacing 5 ton hvac unit · 116 m away
- 7709 La Verdura DrSep 2, 2025Full under slab sewer pipe replacementexcavation to, re-route / replace (hall bathroom, utilitybathroom & master bathroom, a/c condensation drain in frontflower bed, kitchen & washer line under home sewer pipes only)of the plumbing sewer drainpipe under the home only. our planreroutes the under-slab/home sewer pipe and connects it back intothe yard sewer line at the city tap area , effectively replacing the yardsewer line as well, see diagram for tie in location.“ · 120 m away
- 7716 El Pastel DrApr 8, 2026Drain replacement · 124 m away