groundranger
Recent · latest filing Jun 2026Residential

7227 Emory Oak Ln

Dallas, TX 75249

Rooftop solar and battery system permitted in Dallas

A residential rooftop solar system with battery storage was permitted at 7227 Emory Oak Ln on May 21, 2026. The City of Dallas also issued a permit on June 2 for a 200-amp main panel upgrade.

Summarized from City of Dallas records · updated Jun 2, 2026

Projects
3
3 filings
Latest filing
Jun 2, 2026
since May 9, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Project required a main panel upgrade service 200amps - permit requested from the city as an additional permits required:your permit will require additional permits

    Project required a main panel upgrade service 200amps - permit requested from the city as an additional permits required:your permit will require additional permits

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-003175
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 3rd party mcr with battery install a 19.680 kw dc / 14.270 kw ac rooftop solar pv system consisting of 48 amps 410w modules, duracell d600 and d350 inverters, and (3) sonnenhome 20 kwh batteries. scope includes new 200a main service panel upgrade, pv ac disconnects, ess ac disconnects, non?essential loads panel, and all associated wiring and equipment per stamped engineering plans. will require main panel upgrade

    3rd party mcr with battery install a 19.680 kw dc / 14.270 kw ac rooftop solar pv system consisting of 48 amps 410w modules, duracell d600 and d350 inverters, and (3) sonnenhome 20 kwh batteries. scope includes new 200a main service panel upgrade, pv ac disconnects, ess ac disconnects, non?essential loads panel, and all associated wiring and equipment per stamped engineering plans. will require main panel upgrade

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000131
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. No decking

    No decking

    City of Dallas permitResidential Roofing Permit
    Record
    RES-ROOF-25-000024
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7227 Emory Oak Ln

What is being built at 7227 Emory Oak Ln?

City permits indicate a rooftop solar system with battery storage is being installed at the residence. The solar permit was filed May 21, 2026.

How large is the solar system at 7227 Emory Oak Ln?

The permit describes a 19.68-kilowatt DC, 14.27-kilowatt AC rooftop system made up of 48 solar modules.

How many batteries are planned at 7227 Emory Oak Ln?

The May 21, 2026 solar permit lists three 20-kilowatt-hour batteries.

Is the electrical panel being upgraded at 7227 Emory Oak Ln?

Yes. A City of Dallas electrical permit filed June 2, 2026, describes a 200-amp main service panel upgrade.

What permits were filed for 7227 Emory Oak Ln?

City of Dallas records list a residential solar permit, RES-SOLAR-26-000131, filed May 21, 2026, and an electrical permit, RES-ELC-26-003175, filed June 2, 2026. Records also show a roofing permit filed May 9, 2025.

Also being built nearby

All of 75249

More solar installs in 75249.

Get alerts for 7227 Emory Oak Ln