groundranger
Active · latest filing Nov 2026Residential

7362 Blue Sage Dr

Dallas, TX 75249

Roof-mounted solar and battery permitted at 7362 Blue Sage Dr

City of Dallas permits indicate a 9.240 kW roof-mounted solar installation with a battery at this residence. The solar permit was filed November 3, 2026, and a separate battery installation permit was filed November 4, 2026.

Summarized from City of Dallas records · updated Nov 4, 2026

Projects
2
2 filings
Latest filing
Nov 4, 2026
since Nov 3, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Installation of battery

    Installation of battery

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-006850
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr with battery installation of roof mounted solar with 9.240 kw with battery

    Mcr with battery installation of roof mounted solar with 9.240 kw with battery

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000358
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7362 Blue Sage Dr

What is being installed at 7362 Blue Sage Dr?

City of Dallas permits indicate roof-mounted solar rated at 9.240 kW with a battery, along with a separate battery installation permit. The permits were filed November 3 and 4, 2026.

Is solar being installed at 7362 Blue Sage Dr in Dallas?

Yes. A City of Dallas residential solar permit describes a 9.240 kW roof-mounted solar installation with a battery. It was filed November 3, 2026.

Does the solar installation at 7362 Blue Sage Dr include a battery?

Yes. The solar permit describes the roof-mounted system as being installed with a battery. A separate battery installation permit was filed the next day.

When were permits filed for solar at 7362 Blue Sage Dr?

The City of Dallas solar permit, RES-SOLAR-26-000358, was filed November 3, 2026. A separate electrical permit for battery installation, RES-ELC-26-006850, was filed November 4, 2026.

How large is the solar system planned for 7362 Blue Sage Dr?

The City of Dallas solar permit describes a roof-mounted system rated at 9.240 kW. The permit was filed November 3, 2026.

Also being built nearby

All of 75249

More solar installs in 75249.

Get alerts for 7362 Blue Sage Dr