9202 Sugarberry Rd
Dallas, TX 75249
9202 Sugarberry Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 9202 Sugarberry Rd, Dallas, TX 75249. The most recent, filed December 30, 2020, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Dec 30, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 30, 2020
- since Dec 30, 2020
- Largest scope
- —
- Listed value
- $486
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9202 Sugarberry Rd
What is being built at 9202 Sugarberry Rd?
The latest filing (City of Dallas permit 2012303015, December 30, 2020) covers replace or modify existing hvac.
How many permits and filings does 9202 Sugarberry Rd have?
1 filing across 1 project, from December 30, 2020 to December 30, 2020.
How much is the construction at 9202 Sugarberry Rd worth?
Permits at this address list about $486 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9202 Sugarberry Rd?
Yes. Nearby filings include 7101 Hardwood Trl (remove and replace 3 tab roof system with new 30year architectural roof system, Apr 11, 2026); 7120 Field View Ln (will raise to a reasonably level position:the left 12 feet of the front wall and all the left wall.will raise to the extent the structure will allow.will install 9 double concrete pilings under the walls described above, each driven to a substantial point of refusal. will patch the concrete at points of excavation on completion, Jun 24, 2026); 7105 Chinaberry Rd (3 ton deluxe heat pump system upflow complete, Sep 9, 2026).
How do I get alerts for new permits at 9202 Sugarberry Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75249- 7101 Hardwood TrlApr 11, 2026Remove and replace 3 tab roof system with new 30year architectural roof system · 14 m away
- 7120 Field View LnJun 24, 2026Will raise to a reasonably level position:the left 12 feet of the front wall and all the left wall.will raise to the extent the structure will allow.will install 9 double concrete pilings under the walls described above, each driven to a substantial point of refusal. will patch the concrete at points of excavation on completion · 86 m away
- 7105 Chinaberry RdSep 9, 20263 ton deluxe heat pump system upflow complete · 98 m away
- 7112 Chinaberry RdAug 25, 2026Foundation repair: install 26 piers · 119 m away
- 7141 Field View LnNov 6, 2026Installation of three lighting poles · 127 m away
- 7208 Field View LnOct 16, 2026Replacing the electric water heater in the garage · 280 m away
- 7208 Hardwood TrlMay 21, 2025Tunnel to repair building drain · 297 m away
- 7211 Chinaberry RdNov 26, 2025Nsfaa detached carport addition · 316 m away
- 7212 Chinaberry RdFeb 11, 2026Reroof · 325 m away
- 7225 Hardwood TrlMay 26, 2026Gas main relay(gas pressure test) · 344 m away
- 7106 Christie LnDec 1, 2025Replace 2.5 ton pancake straight ac system · 391 m away
- 7114 Christie LnJul 1, 2026Water heater traditional changeout · 396 m away