9730 Sophora Cir
Dallas, TX 75249
3.5-ton system replacement permitted at 9730 Sophora Cir
A 3.5-ton system replacement was permitted at 9730 Sophora Cir in Dallas on November 2, 2025. The City of Dallas record lists it as a residential mechanical permit, number RES-MEC-25-003415.
Summarized from City of Dallas records · updated Nov 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 2, 2025
- since Nov 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9730 Sophora Cir
What is being built at 9730 Sophora Cir?
A City of Dallas residential mechanical permit indicates a 3.5-ton system replacement. The record does not describe new construction.
When was work permitted at 9730 Sophora Cir?
The permit was filed on November 2, 2025.
What is the permit number for 9730 Sophora Cir?
The City of Dallas permit number is RES-MEC-25-003415.
Is 9730 Sophora Cir a new building project?
The available record is for a residential mechanical permit describing a 3.5-ton system replacement; it does not indicate a new building.
What kind of permit was issued for 9730 Sophora Cir?
The City of Dallas lists the filing as a Residential Mechanical Permit for a 3.5-ton system replacement.
Also being built nearby
All of 75249- 7326 Emory Oak LnMay 7, 2026Planel change, main disconnect with surge protection · 111 m away
- 7409 Flameleaf PlOct 6, 2020Replace or modify existing hvac · 158 m away
- 9919 Deer Hollow DrJan 25, 2021Remodel existing plumbing · 171 m away
- 9633 Sophora CirAug 24, 2026Repairing sewer main due to root penetration · 185 m away
- 7411 Cloverglen DrSep 18, 2026Full system install · 187 m away
- 9625 Sophora CirOct 7, 20263 ton hp/ah split system rheem · 190 m away
- 9621 Sophora CirApr 23, 2026Re-roof; no re-deck · 190 m away
- 7338 Cloverglen DrJul 24, 2026Mcr with battery installation of a 11.080 kw ac roof mount pv system with 5kwh dura 5 battery and a 225a main panel upgrade · 191 m away
- 7334 Cloverglen DrJun 25, 20264-ton condenser with 88k btus furnace changeout · 193 m away
- 9840 Sophora CirMar 12, 20263rd party approved plans for installation of duracell battery (ess) · 206 m away
- 7314 Cloverglen DrOct 26, 2026Mcr with battery project consists of installing a 27?panel (11.07?kw dc / 8.02?kw ac) roof?mounted solar pv system with (2) sonnen 20?kwh batteries and associated duracell microinverters per stamped engineering. a main panel upgrade to a new 200a service panel and 200a main breaker is required per the approved plans · 206 m away
- 7454 Emory Oak LnMay 14, 2026Reroof · 242 m away