7540 L B J Fwy
Dallas, TX 75251
Dallas permits cover lobby work, stairs and pool utilities
Permits filed from July 7 to November 7, 2026, cover a west tower lobby remodel, outdoor concrete stairs and a walk path, and electrical and gas-line work related to a pool. The lobby permit describes a new vestibule and reception cabinetry, plus replacement of slate flooring in first-floor corridors. A separate permit covers foundation pilings and void fill.
Summarized from City of Dallas records · updated Nov 7, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Nov 7, 2026
- since Jul 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projects900 sq ftstairs and walk path-4000 psi, #3 rebar, 18oc, or as needed per standardpractice for stairs, broomoutdoor concrete stairs-steps riser 5" to 7" all matching, projected 6" riser-steps depth: 11" minimum, 12" to 16" projected-side of stairs, concrete turn down to hold in stair basematerial small border wall for landscape bed. ldallas code:-maximum riser 7", minimum riser 4"-stairs bust be at least 44" wide (84" wide beinginstalled)-outdoor stairs: headroom clearance not applicable.concrete walk path-7' wide, 4" thick, adjacent to buildingrailing: match existinghand railing: 2" round steel tube-handrails must be positioned between 34 and 38inches measured vertically from the stair tread nosing.-rail must extend at least 12 inches beyond the topriser and continue for the depth of one tread at thebottom riser.-1.25" to 2" is dallas code for rail.guardrail and baulster-2" top round steel tube-dallas code: porches, balconies, or raised floorsurfaces located more than 30 inches above the floorbelow must have guards at least 42 inches high.-horizontal bars 1.5" round steel tube-dallas code: intermediate rails or balusters must bespaced close enough so that a 4-inch sphere cannotpass through any opening
900 sq ftstairs and walk path-4000 psi, #3 rebar, 18oc, or as needed per standardpractice for stairs, broomoutdoor concrete stairs-steps riser 5" to 7" all matching, projected 6" riser-steps depth: 11" minimum, 12" to 16" projected-side of stairs, concrete turn down to hold in stair basematerial small border wall for landscape bed. ldallas code:-maximum riser 7", minimum riser 4"-stairs bust be at least 44" wide (84" wide beinginstalled)-outdoor stairs: headroom clearance not applicable.concrete walk path-7' wide, 4" thick, adjacent to buildingrailing: match existinghand railing: 2" round steel tube-handrails must be positioned between 34 and 38inches measured vertically from the stair tread nosing.-rail must extend at least 12 inches beyond the topriser and continue for the depth of one tread at thebottom riser.-1.25" to 2" is dallas code for rail.guardrail and baulster-2" top round steel tube-dallas code: porches, balconies, or raised floorsurfaces located more than 30 inches above the floorbelow must have guards at least 42 inches high.-horizontal bars 1.5" round steel tube-dallas code: intermediate rails or balusters must bespaced close enough so that a 4-inch sphere cannotpass through any opening
City of Dallas permitCommercial Alteration Addition PermitBu zo remodel of lobby of west tower including addition of an 11 ft x 11 ft vestibule including new exterior storefront and replacement of existing reception desk with some added cabinetry. also includes removal of 3,600 sq ft of slate tile flooring in 1st floor corridors and installation of new stained and sealed concrete
Bu zo remodel of lobby of west tower including addition of an 11 ft x 11 ft vestibule including new exterior storefront and replacement of existing reception desk with some added cabinetry. also includes removal of 3,600 sq ft of slate tile flooring in 1st floor corridors and installation of new stained and sealed concrete
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 7540 L B J Fwy
What is being built at 7540 L B J Fwy in Dallas?
Dallas permits describe a west tower lobby remodel, outdoor stairs and a walk path, pool-related utility work, and foundation repairs. The filings run from July 7 through November 7, 2026.
What does the lobby remodel at 7540 L B J Fwy include?
Permit COM-ALT-ADD-26-001454, filed July 9, 2026, describes an 11-by-11-foot vestibule, a new exterior storefront, added reception cabinetry, and replacement of 3,600 square feet of slate flooring in first-floor corridors.
Are there pool improvements planned at 7540 L B J Fwy?
Permits indicate pool-related work: a September 25, 2026 plumbing permit covers an underground gas line for a pool heater. A November 7 electrical permit calls for outlets and two lights.
What outdoor work is permitted at 7540 L B J Fwy?
A July 22, 2026 alteration permit describes 900 square feet of concrete stairs and a walk path. It also specifies railings and other stair details.
What's being worked on near Parking Conversion at 7750 LBJ Fwy?
At 7540 L B J Fwy, permits cover lobby, stair and walk-path, pool-utility, and foundation work. The Parking Conversion is a separate project at 7750 LBJ Fwy; its filings describe converting part of an existing parking structure to a retirement community.
When were permits filed for work at 7540 L B J Fwy?
The five City of Dallas permit records span July 7 to November 7, 2026. They include foundation repair, alteration and addition, plumbing, and electrical permits.
Also being built nearby
All of 75251- 7616 Lbj Fwy · Watermark Community ChurchMay 20, 2024Watermark health — renovation/alteration — renovation of existing office suite on level 4. demolition will include removal of existing partitions, doors, casework, and lighting. new construction will include partitions, doors, casework, and lighting · 115 m away
- 7616 L B J FwySep 8, 2026Install 23 total pilings, void fill east wing of the church · 115 m away
- 12089 Park Central DrNov 19, 2020Permanent electrical service · 241 m away
- 7526 Thistle LnSep 23, 2025Gas test ~ · 292 m away
- 7750 L B J FwyJul 27, 2026Qteam meeting 9.8.26 (9am) - address: 7750 lbj addition and alternationscope: we are converting existing parking structure to a retirement community. it includes partial conversion of level 1 and adding new levels 3 and level 4 on top.estimated cost is $4,200,000level 1 is 26,150 sq ft, we are converting 10,370 sq ft to retirement communitylevel 3 and level 4 are 26,150 sq ft each, a total of new 52,300 sq ft for retirement communitythe total new sq ft is 90,940 (28,270 sq ft will remain parking, 62,670 sq ft will be retirement community)26 units on the new floors and 7 on the parking conversion floor · 297 m away
- 7750 Lbj Fwy · Grand Windsor LLCJul 6, 2026Parking conversion — renovation/alteration — conversion of existing parking structure to retirement community · 297 m away
- 7777 L B J FwyOct 15, 2026We are removing and replacing like rtu. no other changes being made · 365 m away
- 13093 Meandering Way · The Church In DallasFeb 17, 2026Install new ac systems · 364 m away
- 13120 Tahoe DrMay 8, 20261 50 gallon gas located in the garage closet · 366 m away
- 12712 Park Central Dr · Mcknight Park Central, Llc.Oct 22, 2026Electrical remodel · 369 m away
- 12700 Park Central Dr · Mcknight Park Central, LLCJul 17, 2026Triumph bank - 16th floor renovation — renovation/alteration — non-structural interior finish-out in an existing single floor suite for triumph bank. scope includes new finishes, minor wall construction, hvac adjustments, plumbing for new coffee/break area, and some new electrical/lighting · 393 m away
- 12700 Park Central Drive · Mcknight Park Central, LLCSep 28, 2026Fitness center — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing · 393 m away
More pools in 75251.