Dallas permits cover lobby work, stairs and pool utilities

Permits filed from July 7 to November 7, 2026, cover a west tower lobby remodel, outdoor concrete stairs and a walk path, and electrical and gas-line work related to a pool. The lobby permit describes a new vestibule and reception cabinetry, plus replacement of slate flooring in first-floor corridors. A separate permit covers foundation pilings and void fill.

Summarized from City of Dallas records · updated Nov 7, 2026

Projects
6
6 filings
Latest filing
Nov 7, 2026
since Jul 7, 2026
Largest scope
—
Listed value
—

Permit & project history

6 projects
  1. Add outlets and two lights as directed

    Add outlets and two lights as directed

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005488
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Adding an underground gas line for a pool heater

    Adding an underground gas line for a pool heater

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-003729
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 900 sq ftstairs and walk path-4000 psi, #3 rebar, 18oc, or as needed per standardpractice for stairs, broomoutdoor concrete stairs-steps riser 5" to 7" all matching, projected 6" riser-steps depth: 11" minimum, 12" to 16" projected-side of stairs, concrete turn down to hold in stair basematerial small border wall for landscape bed. ldallas code:-maximum riser 7", minimum riser 4"-stairs bust be at least 44" wide (84" wide beinginstalled)-outdoor stairs: headroom clearance not applicable.concrete walk path-7' wide, 4" thick, adjacent to buildingrailing: match existinghand railing: 2" round steel tube-handrails must be positioned between 34 and 38inches measured vertically from the stair tread nosing.-rail must extend at least 12 inches beyond the topriser and continue for the depth of one tread at thebottom riser.-1.25" to 2" is dallas code for rail.guardrail and baulster-2" top round steel tube-dallas code: porches, balconies, or raised floorsurfaces located more than 30 inches above the floorbelow must have guards at least 42 inches high.-horizontal bars 1.5" round steel tube-dallas code: intermediate rails or balusters must bespaced close enough so that a 4-inch sphere cannotpass through any opening

    900 sq ftstairs and walk path-4000 psi, #3 rebar, 18oc, or as needed per standardpractice for stairs, broomoutdoor concrete stairs-steps riser 5" to 7" all matching, projected 6" riser-steps depth: 11" minimum, 12" to 16" projected-side of stairs, concrete turn down to hold in stair basematerial small border wall for landscape bed. ldallas code:-maximum riser 7", minimum riser 4"-stairs bust be at least 44" wide (84" wide beinginstalled)-outdoor stairs: headroom clearance not applicable.concrete walk path-7' wide, 4" thick, adjacent to buildingrailing: match existinghand railing: 2" round steel tube-handrails must be positioned between 34 and 38inches measured vertically from the stair tread nosing.-rail must extend at least 12 inches beyond the topriser and continue for the depth of one tread at thebottom riser.-1.25" to 2" is dallas code for rail.guardrail and baulster-2" top round steel tube-dallas code: porches, balconies, or raised floorsurfaces located more than 30 inches above the floorbelow must have guards at least 42 inches high.-horizontal bars 1.5" round steel tube-dallas code: intermediate rails or balusters must bespaced close enough so that a 4-inch sphere cannotpass through any opening

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001767
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Bu zo remodel of lobby of west tower including addition of an 11 ft x 11 ft vestibule including new exterior storefront and replacement of existing reception desk with some added cabinetry. also includes removal of 3,600 sq ft of slate tile flooring in 1st floor corridors and installation of new stained and sealed concrete

    Bu zo remodel of lobby of west tower including addition of an 11 ft x 11 ft vestibule including new exterior storefront and replacement of existing reception desk with some added cabinetry. also includes removal of 3,600 sq ft of slate tile flooring in 1st floor corridors and installation of new stained and sealed concrete

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001454
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Install 27 total pilings, void fill

    Install 27 total pilings, void fill

    City of Dallas permitCommercial Foundation Repair
    Record
    COM-FDN-26-000080
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Interior remodel of 7th floor

    Interior remodel of 7th floor

    City of Dallas permitBuilding (BU) Commercial Renovation$35
    Record
    1909231045
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7540 L B J Fwy

What is being built at 7540 L B J Fwy in Dallas?

Dallas permits describe a west tower lobby remodel, outdoor stairs and a walk path, pool-related utility work, and foundation repairs. The filings run from July 7 through November 7, 2026.

What does the lobby remodel at 7540 L B J Fwy include?

Permit COM-ALT-ADD-26-001454, filed July 9, 2026, describes an 11-by-11-foot vestibule, a new exterior storefront, added reception cabinetry, and replacement of 3,600 square feet of slate flooring in first-floor corridors.

Are there pool improvements planned at 7540 L B J Fwy?

Permits indicate pool-related work: a September 25, 2026 plumbing permit covers an underground gas line for a pool heater. A November 7 electrical permit calls for outlets and two lights.

What outdoor work is permitted at 7540 L B J Fwy?

A July 22, 2026 alteration permit describes 900 square feet of concrete stairs and a walk path. It also specifies railings and other stair details.

What's being worked on near Parking Conversion at 7750 LBJ Fwy?

At 7540 L B J Fwy, permits cover lobby, stair and walk-path, pool-utility, and foundation work. The Parking Conversion is a separate project at 7750 LBJ Fwy; its filings describe converting part of an existing parking structure to a retirement community.

When were permits filed for work at 7540 L B J Fwy?

The five City of Dallas permit records span July 7 to November 7, 2026. They include foundation repair, alteration and addition, plumbing, and electrical permits.

Also being built nearby

All of 75251

More pools in 75251.

Get alerts for 7540 L B J Fwy