17416 Calla Dr
Dallas, TX 75252
17416 Calla Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 17416 Calla Dr, Dallas, TX 75252. The most recent, filed July 30, 2025, covers: “New drive way and approach approximately 1500 sq ft rebar #3 every 18 inches c approach: rebar #4 every 16 inches”.
Compiled from City of Dallas records · updated Jul 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2025
- since Jul 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNew drive way and approach approximately 1500 sq ft rebar #3 every 18 inches c approach: rebar #4 every 16 inches
New drive way and approach approximately 1500 sq ft rebar #3 every 18 inches c approach: rebar #4 every 16 inches
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 17416 Calla Dr
What is being built at 17416 Calla Dr?
The latest filing (City of Dallas permit RES-DSW-25-000283, July 30, 2025) covers new drive way and approach approximately 1500 sq ft rebar #3 every 18 inches c approach: rebar #4 every 16 inches.
How many permits and filings does 17416 Calla Dr have?
1 filing across 1 project, from July 30, 2025 to July 30, 2025.
Is there other construction near 17416 Calla Dr?
Yes. Nearby filings include 17417 Calla Dr (install 6 steel pipe piers, Nov 10, 2026); 17420 Calla Dr (repairing water line, slab leak, Nov 12, 2025); 17422 Calla Dr (solar rooftop, backup battery, and mpu/mpr, Oct 21, 2025).
How do I get alerts for new permits at 17416 Calla Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 17417 Calla DrNov 10, 2026Install 6 steel pipe piers · 13 m away
- 17420 Calla DrNov 12, 2025Repairing water line, slab leak · 14 m away
- 17422 Calla DrOct 21, 2025Solar rooftop, backup battery, and mpu/mpr · 21 m away
- 17432 Calla DrJul 9, 2026Driveway approach for half-moon driveway 20x12 and 18x12 approach · 55 m away
- 17409 Cathys PlOct 15, 2025Comp. shingle rfg. - with felt 48.26 qremove 1 layer of felt/underlayment, remove and haul off roofing felt - 15 lb. 48.26 sqremove and install new drip edge 549 lfinstall synthetic roofing underlayment 48.26 sqinstall ice and water shield on rake and valleysinstall laminated - comp. shingle 55.01 sq owens corning trudefinition duration storm onyx black algae resistant architectural roof shingleship / ridge cap - standard profile - composition shingles rizeridge onyx black algae resistant hip and ridge roofing shingles189 lfremove flashing - pipe jack- 4 e.ainstall flashing - pipe jack 4 e.adetach & reset exhaust cap - through roof - 6" to 8" 2 e.ar&r 4 turbines weathered wood galvanized steel internally braced dual-bearing wind roof turbiner&r 60 sq. in. nfa aluminum slant back roof louver static vent in black 4 e.aprime & paint roof vent and pipes covershaul debris - per pickup truck load including dump fees · 89 m away
- 17401 Cathys PlFeb 19, 2026Had to replace gas valve for cooktop and oven and water heater. removed and replaced a one inch 90 on water heater and had to pipe out furnace and replace stop · 96 m away
- 17319 Calla DrJul 27, 20262 system complete replacement 4-ton gas level 3 complete system replacement 2-ton gas level 3 complete system replacement · 117 m away
- 17316 Calla DrFeb 23, 2026Replacing 50 gallon gas water heater · 118 m away
- 17312 Calla DrSep 11, 2026All electrical wiring · 121 m away
- 17308 Calla DrNov 18, 2026Hvac mechanical rough · 124 m away
- 17301 Calla DrOct 2, 202613 x 18' demolition & pourback · 128 m away
- 17419 Marianne CirNov 4, 2026Installing 2-ton ducted mini-split · 134 m away