17605 Loveland Dr
Dallas, TX 75252
Water service line replacement and water heater installation
City of Dallas permits show residential plumbing work at 17605 Loveland Dr: a main water service line replacement was permitted on April 20, 2026. An earlier permit, filed May 26, 2025, covers installation of a 50-gallon gas water heater in the garage.
Summarized from City of Dallas records · updated Apr 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 20, 2026
- since May 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplacement of main water service line from the city water meter to the point where the water line enters the foundation of the residence
Replacement of main water service line from the city water meter to the point where the water line enters the foundation of the residence
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 17605 Loveland Dr
What is happening at 17605 Loveland Dr in Dallas?
City permits record a replacement of the home's main water service line and installation of a 50-gallon gas water heater.
Was a new home permitted at 17605 Loveland Dr?
The records provided show residential plumbing permits, not a permit for new home construction.
When was the water service line replacement permitted?
The City of Dallas permit was filed April 20, 2026. Permit number RES-PLM-26-004171 describes replacement from the city water meter to where the line enters the home's foundation.
What was the 2025 permit for at 17605 Loveland Dr?
Permit RES-PLM-25-000725, filed May 26, 2025, covers installation of a 50-gallon gas water heater in the garage.
Is a business opening at 17605 Loveland Dr?
The available records describe residential plumbing work and do not identify a business opening.
Also being built nearby
All of 75252- 6207 Berthoud PassApr 21, 2026X installing 5 total pilings (5 exterior) · 33 m away
- 6210 Berthoud PassMay 18, 2026Replacing a 150 amp panel, 150 amp main disconnect, grounding and surge protection · 46 m away
- 6214 Berthoud PassJul 8, 2026Gas test for gas release · 48 m away
- 6212 Telluride LnJun 3, 2025Replacing 40 gallon gas water heater in garage · 61 m away
- 6205 Telluride LnJul 17, 20264 ton basic condenser & coil · 70 m away
- 6217 Telluride LnApr 11, 2026Remove and replace asphalt roof system. owens corning duration class 3 system · 75 m away
- 17619 Loveland DrAug 23, 2026Install hvac · 94 m away
- 6101 Baymar LnJun 18, 2025Install two gas system 3 ton and 2.5 ton includes condensers,furnance, coils, duct work, grills and plenum · 132 m away
- 6115 Baymar LnJan 22, 2026Gas riser replacement · 150 m away
- 6109 Baymar LnJun 15, 2026Electrical for patio · 154 m away
- 6201 Crested Butte DrDec 12, 2025Replaced water line in yard via excavation of trench up to 53 feet · 159 m away
- 6310 Telluride LnDec 9, 2025Duct mods · 165 m away