17787 Waterview Pkwy
Dallas, TX 75252 · Waterview Academic & Admin Center, Utd Sci- Dr. Liu Lab + 1 more
UT Dallas registers renovations at Waterview academic center
Renovations are planned for the multi-tenant building at 17787 Waterview Pkwy, including work on a five-story office building, a basement lab and second-floor office space. The latest TDLR registration, filed October 20, 2026, covers paths from the parking areas, restrooms and elevators; its applicant-estimated cost is $10 million. Two additional renovation registrations were filed April 30, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 20, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 20, 2026
- since Apr 30, 2026
- Largest scope
- 141,119 sf
- Estimated cost
- $10M
- state registration
Where this project stands
In state plan reviewWaterview Academic & Admin Center
141,119 sq ft · $10M est.
- RegisteredOct 20, 2026
- Plan reviewnow
- ConstructionMar '27 – May '27
- Inspected
- Closed
Construction is scheduled to start Mar 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsRenovation of 5story office building, paths of travel from the existing parking lot (surface and garage), redoing the restrooms up the core of the building, and refinishing the elevators. — university of texas at dallas
TDLR project registrationRenovation/AlterationProject Registered141,119 sq ft$10M est.- Project #
- TABS2027004020
- Tenant / owner
- Waterview Academic & Admin Center
- Design firm
- Pro
- Contact
- Pro
Lab renovation in the basement of an existing building. scope requires minimal demolition, casework, and mep systems. — utd science building
TDLR project registrationRenovation/AlterationReview Complete2,100 sq ft$850K est.- Project #
- TABS2026019081
- Tenant / owner
- Utd Sci- Dr. Liu Lab
- Design firm
- Pro
- Contact
- Pro
Office finish out on the second floor. first phase of a multiphase project. not to be used until a later phase is completed to make the building occupiable. — waterview academic and administration center (waac)
TDLR project registrationRenovation/AlterationReview Complete3,039 sq ft$1.2M est.- Project #
- TABS2026018996
- Tenant / owner
- Utd - Psychological Services
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 17787 Waterview Pkwy
What is being built at 17787 Waterview Pkwy?
TDLR records list renovations at the multi-tenant building, including work on a five-story office building, a basement lab and second-floor office space. The latest registration, TABS2027004020, was filed October 20, 2026.
Is a new building planned at 17787 Waterview Pkwy?
The three TDLR records describe renovation or alteration work, not a new building. The latest registration covers renovations to an existing five-story office building.
What renovations are planned for the Waterview Academic & Admin Center?
The October 20, 2026 registration describes paths of travel from the surface and garage parking, restroom work, and elevator refinishing. The registration is TABS2027004020.
Is a lab being renovated at 17787 Waterview Pkwy?
Yes. A TDLR registration filed April 30, 2026 describes a 2,100-square-foot basement lab renovation with minimal demolition, casework and mechanical, electrical and plumbing systems. Its registration number is TABS2026019081.
What is planned for the second floor at 17787 Waterview Pkwy?
A registration filed April 30, 2026 describes an office finish-out for Psychological Services. It is the first phase of a multiphase project and cannot be used until a later phase makes the building occupiable; the registration is TABS2026018996.
What work is planned near Lennox Controls Lab on Waterview Parkway?
At 17787 Waterview Pkwy, TDLR records show renovations to a multi-tenant building, including a five-story office building, a basement lab and second-floor office space. The latest registration was filed October 20, 2026.
Also being built nearby
All of 75252- 17811 Waterview PkwySep 22, 2026Replace failed 3/4" rpz backflow preventer (zurn wilkins 375xl) serving chiller make-up water in penthouse mechanical room · 37 m away
- 18325 Waterview PkwyApr 24, 2026This is the correct address to use for the entire building,1. removal of obsolete utility primary switch and metering enclosure at north and south utilityservices. 2. replacement of utility service-entrance conductors and connection to existing servicemain circuit breaker at north and south utility services. 3. removal of bypass conductors between existing service main circuit breaker and pmh at north and south utility services · 70 m away
- 17657 Waterview Parkway · Lennox Industries Inc.Aug 11, 2026Lennox controls lab — renovation/alteration — interior renovation on level 1 · 166 m away
- 17657 Waterview PkwyNov 3, 2026Mcr interior renovation of approximately 16,000 square feet of the building located at 17657 waterview pkwy 75252. this includes demolition of existing walls, flooring, ceiling, electrical · 166 m away
- 17655 Waterview PkwyMay 1, 2026Roof overlay of tpo on an existing bur roof system with pea size gravel. removing pea gravel, level any uneven spots or spud areas in need. remove all flashing, curbs, walls and penetrations. mechanically fasten 1/2" dens deck over existing roof surface and mechanically attach tpo. remove skylights and install new steel decking. all pitch pans will have pourable sealer applied for watertight seal. all boots will be heat welded for maximum seal. support and gas or electrical lines with clamps · 169 m away
- 17620 Bottlebrush DrOct 29, 2026Gas test to restored gas · 254 m away
- 17722 Bottlebrush DrMay 26, 2026Install 12 total pilings · 269 m away
- 17808 Bottlebrush DrJan 13, 2026Installation of a custom metal sliding gate measuring 26 feet wide by 6 feet tall, installed across the rear alley driveway. gate to be constructed with a welded steel frame and finished with medium-brown, side-by-side 4-inch pickets across the entire frame.gate system to include heavy-duty wheels and roller boxes, (2) 6-inch guide rollers, (1) 4-inch 11-gauge steel guide post, (1) 4-inch 14-gauge steel catch post, and a v-track with concrete footing for the open track. gate will be installed as a sliding gate spanning the full width of the rear driveway.scope also includes installation of additional fencing to close any remaining gaps along the existing fence line, as well as demolition and removal of existing interior fencing as required · 302 m away
- 17863 Bottlebrush DrNov 11, 2025Installing 8ft cedar board on board with cap and trim fence with steel posts, and 3 cedar walk gates · 314 m away
- 17824 Bottlebrush DrOct 15, 2020Construct new sfd · 319 m away
- 8241 Zoysia LnJul 17, 2025Replacing 3.5 ton gas hvac system · 327 m away
- 8320 Tuscarora LnJul 31, 2026Change breaker and a gfci receptacle is a duplex but only working in one side · 343 m away
More demolitions in 75252, offices in 75252, parking structures in 75252.