17912 Cedar Creek Canyon Dr
Dallas, TX 75252
Master bathroom renovation at 17912 Cedar Creek Canyon Dr
Permits indicate plumbing work for a master bathroom renovation at this Dallas residence. The alteration permit was filed July 16, 2026, followed by a new plumbing permit on August 6, 2026.
Summarized from City of Dallas records · updated Aug 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 6, 2026
- since Jul 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa plumbing work for the master bathroom renovation will be performed by licensed subcontractor megapipe plumbing (license no. m-43284). scope includes relocation and reconfiguration of all associated water, drain, and gas systems to support a redesigned bathroom layout.work includes expansion of the existing shower into the former water heater alcove with removal of the separating wall, and relocation of the shower drain and shower head to align with the new enlarged footprint. the bathtub will be relocated from a freestanding center position to a wall-to-wall installation against the back wall, including new drain repositioning and adjustments to supply lines for a deck-mounted faucet.existing bathtub and shower supply lines will be evaluated and modified as needed to accommodate new fixture locations. a freestanding tub configuration will be replaced with a centered drain location per the revised slab layout.two existing tank water heaters will be removed and replaced with two rinnai tankless water heaters, installed in separate designated locations, including all required gas and electrical connections.exterior masonry work includes removal of an existing exterior access door on the master bedroom side wall, framing, insulating, and infilling the opening with matching brick to restore the exterior envelope. all framing and masonry work will be performed by revival reconstruction, with coordination underway to schedule the brick crew early next week to complete the closure of the exterior wall.all work will be completed in accordance with approved plans, post-tension slab test results, and applicable plumbing and building codes. the water heaters are being finalized today.please advise if there are any concerns or if additional approvals are required prior to commencing
Nsfaa plumbing work for the master bathroom renovation will be performed by licensed subcontractor megapipe plumbing (license no. m-43284). scope includes relocation and reconfiguration of all associated water, drain, and gas systems to support a redesigned bathroom layout.work includes expansion of the existing shower into the former water heater alcove with removal of the separating wall, and relocation of the shower drain and shower head to align with the new enlarged footprint. the bathtub will be relocated from a freestanding center position to a wall-to-wall installation against the back wall, including new drain repositioning and adjustments to supply lines for a deck-mounted faucet.existing bathtub and shower supply lines will be evaluated and modified as needed to accommodate new fixture locations. a freestanding tub configuration will be replaced with a centered drain location per the revised slab layout.two existing tank water heaters will be removed and replaced with two rinnai tankless water heaters, installed in separate designated locations, including all required gas and electrical connections.exterior masonry work includes removal of an existing exterior access door on the master bedroom side wall, framing, insulating, and infilling the opening with matching brick to restore the exterior envelope. all framing and masonry work will be performed by revival reconstruction, with coordination underway to schedule the brick crew early next week to complete the closure of the exterior wall.all work will be completed in accordance with approved plans, post-tension slab test results, and applicable plumbing and building codes. the water heaters are being finalized today.please advise if there are any concerns or if additional approvals are required prior to commencing
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 17912 Cedar Creek Canyon Dr
What is being built at 17912 Cedar Creek Canyon Dr?
Permits indicate a master bathroom renovation, including changes to the shower and bathtub layout and associated plumbing. The records describe work at a residence, not a new home.
When was the renovation permitted?
The residential alteration permit, RES-ALT-ADD-26-001094, was filed July 16, 2026. A new plumbing permit, RES-PLM-26-008260, followed on August 6, 2026.
What work does the bathroom renovation include?
The permit description includes expanding the shower, relocating the bathtub, and reconfiguring plumbing lines. It also describes replacing two tank water heaters with tankless units.
Are they building a new house at this address?
The records describe a master bathroom renovation and plumbing work at an existing residence. They do not describe construction of a new house.
What are the permit numbers for 17912 Cedar Creek Canyon Dr?
The records list alteration permit RES-ALT-ADD-26-001094, filed July 16, 2026, and plumbing permit RES-PLM-26-008260, filed August 6, 2026.
Also being built nearby
All of 75252- 17916 Cedar Creek Canyon DrSep 25, 2025Remove and replace roof shingles only. no decking · 6 m away
- 17919 Cedar Creek Canyon DrMay 28, 2025Remove and replace 1 full hvac system · 16 m away
- 17911 Lost View RdSep 15, 2026Electrical for pool · 124 m away
- 5619 Twin Brooks DrMay 11, 2026Replaced with goodman 4 ton 14.3 seer 2 straight cool horizontal gas system r32 · 125 m away
- 5604 Covehaven DrAug 26, 20261 1/4 gas relay replacement from the meter to the home that was leaking under ground. installing 1 1/4 poly with anode less risers back to the soil with tracer wire and connected to the home with a new iron body shut off and union and banked at the meter to the existing pool heater line · 127 m away
- 5603 Covehaven DrAug 12, 20262 ton system change out · 133 m away
- 17827 Cedar Creek Canyon DrMar 12, 2026Remove and replace 3.5t heating & air conditioning equipment with new - connecting to existing ductwork and drains · 133 m away
- 17823 Cedar Creek Canyon DrAug 21, 2026Pipe pull yard water service · 137 m away
- 5611 Covehaven DrFeb 10, 2026Gas test · 144 m away
- 17816 Cedar Creek Canyon DrOct 7, 202650 foot tunnel under the foundation of property's master bathroom to expose sewer pipes and drains for replacement · 148 m away
- 5707 Richwater DrSep 3, 2026Replace 2 ton gas hvac unit · 180 m away
- 5704 Richwater DrMar 5, 2026Rework ductwork in kitchen remodel vent-a-hood exhaust fans install new 1.5ton gas heat hvac system and ductwork · 190 m away