18201 Frankford Lake Cir
Dallas, TX 75252
18201 Frankford Lake Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 18201 Frankford Lake Cir, Dallas, TX 75252. The most recent, filed July 1, 2025, covers: “4 ton system replacement”.
Compiled from City of Dallas records · updated Jul 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2025
- since Jul 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 18201 Frankford Lake Cir
What is being built at 18201 Frankford Lake Cir?
The latest filing (City of Dallas permit RES-MEC-25-001063, July 1, 2025) covers 4 ton system replacement.
How many permits and filings does 18201 Frankford Lake Cir have?
1 filing across 1 project, from July 1, 2025 to July 1, 2025.
What is being built near Frankford Square, in Dallas?
18201 Frankford Lake Cir is about 138 m from Frankford Square, (18101 Preston Rd). Its latest filing is for 4 ton system replacement.
Is there other construction near 18201 Frankford Lake Cir?
Yes. Nearby filings include 18355 Frankford Lake Cir (install 1.5 ton fur down system, May 22, 2026); 18319 Frankford Lake Cir (hvac replacement, Sep 15, 2025); 6110 Stapleford Cir (hvac change out – remove & replace 1 full system. attic/garage pull-down access. no new duct work, Jun 26, 2026).
How do I get alerts for new permits at 18201 Frankford Lake Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 18355 Frankford Lake CirMay 22, 2026Install 1.5 ton fur down system · 68 m away
- 18319 Frankford Lake CirSep 15, 2025Hvac replacement · 75 m away
- 6110 Stapleford CirJun 26, 2026Hvac change out – remove & replace 1 full system. attic/garage pull-down access. no new duct work · 103 m away
- 6052 Thursby AveJun 12, 2025Remove existing roof · 115 m away
- 6076 Thursby AveJul 27, 2026Excavate and install double cleanout · 120 m away
- 6080 Thursby AveSep 16, 20256080 thursby install 18 concrete pilings to stabilize foundation · 122 m away
- 18101 Preston Rd · Frankford Square, LLCJul 1, 2026Electrical repairs · 138 m away
- 6134 Stapleford CirJul 15, 2025Install 50 gallon natural gas wh in garage · 153 m away
- 6125 Stapleford CirJun 10, 2026Remove & replace 2 full systems + attic installation + no new duct work · 153 m away
- 18143 Frankford Lake CirOct 31, 2025Mcr with battery residential addition - solar rooftop, backup battery, and mpu/mpr · 159 m away
- 18135 Frankford Lake CirMay 16, 2025Replace water heater in 3rd floor attic · 169 m away
- 6136 Thursby AveFeb 25, 2026Installing 14 exterior piers · 172 m away