19019 Campbell Rd
Dallas, TX 75252
Driveway replacement and water softener permitted at 19019 Campbell Rd
City of Dallas permits indicate work at 19019 Campbell Rd includes replacing the existing right-side driveway and driveway approach, with a stamped concrete finish. The driveway permit was filed August 27, 2026; an earlier plumbing permit, filed November 23, 2025, covers a water softener and backflow device in the flowerbed.
Summarized from City of Dallas records · updated Aug 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 27, 2026
- since Nov 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRemoval and replacement of the existing right-side driveway and driveway approach. the new installation will include a stamped concrete finish design. work includes demolition, excavation, grading, formwork, concrete placement, finishing, and site cleanup
Removal and replacement of the existing right-side driveway and driveway approach. the new installation will include a stamped concrete finish design. work includes demolition, excavation, grading, formwork, concrete placement, finishing, and site cleanup
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 19019 Campbell Rd
What work is permitted at 19019 Campbell Rd in Dallas?
City of Dallas records show a driveway and driveway approach replacement, plus installation of a water softener and backflow device.
When was the driveway replacement permit filed?
The City of Dallas filed permit RES-DSW-26-000383 on August 27, 2026. It covers removal and replacement of the existing right-side driveway and approach.
Will the new driveway have a stamped concrete finish?
Yes. The description for permit RES-DSW-26-000383 says the replacement will include a stamped concrete finish design.
Was plumbing work also permitted at this address?
Yes. Plumbing permit RES-PLM-25-007883, filed November 23, 2025, covers installing a water softener and backflow device in the flowerbed.
Is a new building planned at 19019 Campbell Rd?
The records provided describe driveway replacement and plumbing work, not construction of a new building.
Also being built nearby
All of 75252- 5706 Mapleshade LnAug 7, 2026Gas test for gas release · 71 m away
- 5714 Mapleshade LnJul 8, 2026Remove of underlayment. install new laminated/architectural asphalt shingles. complete tear-off and remove and replace roofing system including proper ventilation, waterproofing, flashing, and metal work · 75 m away
- 5709 Deseret TrlJun 27, 2025Replacing 50 gallon gas water heater in upstairs closet · 85 m away
- 5727 Mapleshade LnNov 6, 2026To replace x1 50 gal gas water heater in the garage closet · 97 m away
- 5308 Willow Wood LnSep 15, 2025Water leak spot repair under the slab · 123 m away
- 5316 Willow Wood LnDec 8, 2025Ev charger installation · 131 m away
- 5747 Deseret TrlJun 21, 202650 gallon gas water heater · 132 m away
- 5320 Willow Wood LnJul 19, 2026Hvac replacement carrier 2.5 ton sca26 horizontal gas complete · 136 m away
- 5307 Willow Wood LnJul 15, 2026Tunnel sewerline repair · 143 m away
- 5332 Willow Wood LnNov 11, 2025X1 50 gal gas water heater above master closet · 151 m away
- 5315 Willow Wood LnNov 18, 2026Replace double check · 168 m away
- 5702 Buffridge TrlMay 8, 2026Hvac change out – remove & replace 1 full system + attic installation + no new duct · 172 m away
More demolitions in 75252.