5419 Willow Wood Ln
Dallas, TX 75252
Two HVAC replacement permits filed at 5419 Willow Wood Ln
City of Dallas permits indicate replacement of one full HVAC system at the residence, with attic installation and no new ductwork. The permits were filed June 12 and September 3, 2026.
Summarized from City of Dallas records · updated Sep 3, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2026
- since Jun 12, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5419 Willow Wood Ln
What is happening at 5419 Willow Wood Ln?
Two City of Dallas residential mechanical permits indicate replacement of a full HVAC system at the address. Both describe attic installation with no new ductwork.
When were the HVAC permits filed for 5419 Willow Wood Ln?
The permits were filed June 12, 2026 (RES-MEC-26-002925) and September 3, 2026 (RES-MEC-26-004870).
Is a new HVAC system being installed at 5419 Willow Wood Ln?
The permit descriptions say one full system will be removed and replaced. They specify attic installation and no new ductwork.
Does the HVAC work at 5419 Willow Wood Ln include new ducts?
No new ductwork is listed in either permit description.
How many HVAC permits were filed for 5419 Willow Wood Ln?
Two residential mechanical permits are listed: RES-MEC-26-002925, filed June 12, 2026, and RES-MEC-26-004870, filed September 3, 2026.
Also being built nearby
All of 75252- 5427 Willow Wood LnMay 27, 2025Tear off existing roof system down to decking. install synthetic underlayment, ice and water shield and architectural shingles. paint vents to match shingle color, pick up all debris and perform nail sweep · 16 m away
- 5435 Willow Wood LnSep 8, 2026Install 50 gallon gas water heater in garage, 2nd water heater, 40-gallon gas in attic · 31 m away
- 5407 Willow Wood LnNov 6, 2026Excavate and replace both risers on the gas line servicing the pool heater, also make an additional trench for approximately 10 feet from the pool heater to behind the outdoor grill, we will also install 2 new risers and a new poly line to service the grill · 64 m away
- 5612 Pecan Spring CtJun 18, 2025Replace water lines hot and cold through out the wall for the kitchen island, modify a 3/4 manifold, run a 3"water line for 2nd floor, 1 access at the other side modify another manifold and move wqter lines throughout the wall island drain, 9ft tunnel 1 access.run about 25-30ft gas line for island · 134 m away
- 5608 Brushy Creek TrlJan 13, 2026Replacement of 3 hvac systems. 3 air conditioners (2&1/2 ton, 3&1/2 ton, and 4 ton), 3 furnaces and 3 coils · 134 m away
- 5508 Willow Wood LnJan 9, 20263 ton complete · 158 m away
- 5511 Willow Wood LnMay 15, 2026Spot repair of water line under slab · 168 m away
- 5331 Willow Wood LnAug 28, 2026Patio electrical · 170 m away
- 5709 Moss Creek TrlJan 6, 2026Replace gas yard service · 204 m away
- 5701 Moss Creek CtMay 12, 2025Service line replacement · 217 m away
- 5705 Moss Creek CtOct 20, 2025The existing gas riser was leaking in the ground. we excavated the old gas riser and installed a new gas riser · 221 m away
- 5706 Brushy Creek TrlJul 17, 20253 ton gas complete system · 223 m away