5707 Twin Brooks Dr
Dallas, TX 75252
5707 Twin Brooks Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 5707 Twin Brooks Dr, Dallas, TX 75252. The most recent, filed November 18, 2026, covers: “Replace the existing 8' tall fence with new 8' tall cedar on steel posts, set on 6' centers and 24" deep in concrete. any walk through gates will meet pool code: self closing and latches at 54" above grade. the new fence will be in the same layout/lines as the existing fence is now”.
Compiled from City of Dallas records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace the existing 8' tall fence with new 8' tall cedar on steel posts, set on 6' centers and 24" deep in concrete. any walk through gates will meet pool code: self closing and latches at 54" above grade. the new fence will be in the same layout/lines as the existing fence is now
Replace the existing 8' tall fence with new 8' tall cedar on steel posts, set on 6' centers and 24" deep in concrete. any walk through gates will meet pool code: self closing and latches at 54" above grade. the new fence will be in the same layout/lines as the existing fence is now
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 5707 Twin Brooks Dr
What is being built at 5707 Twin Brooks Dr?
The latest filing (City of Dallas permit RES-ACC-26-001469, November 18, 2026) covers replace the existing 8' tall fence with new 8' tall cedar on steel posts, set on 6' centers and 24" deep in concrete. any walk through gates will meet pool code: self closing and latches at 54" above grade. the new fence will be in the same layout/lines as the existing fence is now.
How many permits and filings does 5707 Twin Brooks Dr have?
1 filing across 1 project, from November 18, 2026 to November 18, 2026.
Is there other construction near 5707 Twin Brooks Dr?
Yes. Nearby filings include 5719 Twin Brooks Dr (2.5 ton condenser and 3 ton all-in-one coil for u/s unit, Aug 13, 2026); 5723 Twin Brooks Dr (tub and shower separate being combined into one wet room. new pan liner for entire area and new valves, Feb 9, 2026); 5732 Covehaven Dr (connections at sidewalk by meter - shut off left of the front door, Oct 12, 2026).
How do I get alerts for new permits at 5707 Twin Brooks Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 5719 Twin Brooks DrAug 13, 20262.5 ton condenser and 3 ton all-in-one coil for u/s unit · 24 m away
- 5723 Twin Brooks DrFeb 9, 2026Tub and shower separate being combined into one wet room. new pan liner for entire area and new valves · 25 m away
- 5732 Covehaven DrOct 12, 2026Connections at sidewalk by meter - shut off left of the front door · 62 m away
- 5719 Plumtree DrAug 20, 2026Replace 3 ton hvac unit · 126 m away
- 5711 Plumtree DrMay 30, 2025Replace 2 hvac systems · 130 m away
- 5712 Plumtree DrJul 20, 2026Double sweep cleanout installation · 141 m away
- 5708 Plumtree DrSep 23, 2025Water service line trench repair · 143 m away
- 5808 Covehaven DrMar 2, 2026Mcr install a 19.575 kw roof mounted pv solar system, 45 panels. utility controlled shutdown required to install new 200a ecb between meter and mdp · 185 m away
- 5807 Covehaven DrMar 20, 2026Re roof composition shingles only · 186 m away
- 5826 Windmier LnOct 13, 2025Replace condenser and coil · 193 m away
- 5611 Covehaven DrFeb 10, 2026Gas test · 194 m away
- 5816 Covehaven DrSep 5, 2025We are tearing down current wood fence with brick. we will not move from the existing fence line. we are putting a footer per code 20" wide and 12" deep tied in per code cage style rebar #4 with concrete at 3500 psi. with the same style column rebar cage going up and fill with concrete at 3500 psi approximately 125 liner ft and 8ft tall all new brick nothing is used. we have 811 one there to mark down all lines and utilities throw out the whole are. project to be completed with 2-3 weeks depending weather · 196 m away