5806 Edinburgh St
Dallas, TX 75252
5806 Edinburgh St: 1 project on record
City of Dallas lists 1 filing across 1 project at 5806 Edinburgh St, Dallas, TX 75252. The most recent, filed July 8, 2025, covers: “Replacing 50 gallon gas water heater in closet”.
Compiled from City of Dallas records · updated Jul 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 8, 2025
- since Jul 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5806 Edinburgh St
What is being built at 5806 Edinburgh St?
The latest filing (City of Dallas permit RES-PLM-25-002247, July 8, 2025) covers replacing 50 gallon gas water heater in closet.
How many permits and filings does 5806 Edinburgh St have?
1 filing across 1 project, from July 8, 2025 to July 8, 2025.
Is there other construction near 5806 Edinburgh St?
Yes. Nearby filings include 5805 Edinburgh St (tear off and replace one roof. haul away debris, Jan 19, 2026); 5502 Windmier Cir (water service from meter to doublecheck and doublecheck replacement. only!, Nov 6, 2025); 5826 Edinburgh St (coil and condenser changeout, Jun 24, 2025).
How do I get alerts for new permits at 5806 Edinburgh St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 5805 Edinburgh StJan 19, 2026Tear off and replace one roof. haul away debris · 14 m away
- 5502 Windmier CirNov 6, 2025Water service from meter to doublecheck and doublecheck replacement. only! · 32 m away
- 5826 Edinburgh StJun 24, 2025Coil and condenser changeout · 57 m away
- 5815 Knightsbridge DrAug 5, 2026Nsfaa-build covered deck on west side of house. deck is 9 ft by 44 ft (396 sq ft). there are 5 8x8 posts on the west side of the deck to support the cover. the deck cover is not directly attached to the roof but is supported by 6 braces. there are 3 lights in the ceiling and 3 fixtures for ceiling fans. the switches for the lights and the ceiling fans are mounted on the exterior west wall. there deck has a 36" railing around it with 10 horizontal wires with a separation of 3" between the wires. on the south side of the deck there are 2 steps and on the north side there are 3 steps. the primary material is pine and cedar · 99 m away
- 18701 Campbell RdJul 30, 2026Remove 44 ft. and adding 35ft. on one side · 155 m away
- 5605 Windmier CirAug 26, 2025Electric to pool · 176 m away
- 5609 Windmier CirJul 22, 2026Pipe pull water service · 180 m away
- 5615 Windmier CirJan 12, 2026Mcr with battery install energy storage system · 185 m away
- 5809 London LnJan 8, 2026Replace existing 5-ton outdoor condenser el18kcv · 189 m away
- 5715 Thames CtMay 18, 2026Hvac replacement · 194 m away
- 5815 London LnMay 21, 2026Install (1) 40 gal gas water heater in attic (change out) · 195 m away
- 5719 Thames CtApr 21, 2026Install exterior and interior piers to stabilize the foundation · 197 m away