6423 Wrenwood Dr
Dallas, TX 75252
Home remodel and patio cover permitted on Wrenwood Dr
City of Dallas records indicate a residential interior remodel at 6423 Wrenwood Dr, permitted September 26, 2025. Later permits cover a 270-square-foot patio cover with electrical work and 45 square feet of concrete, filed July 21, 2026, plus a patio electrical permit filed August 18, 2026.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Aug 18, 2026
- since Sep 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsRewire where walls are removed, rewire kitchen. partial rewire 3 bathrooms, and 2- bedroom closets, and a plug to move when in the way of a moved wall. no change in electric meter or service main panel
Rewire where walls are removed, rewire kitchen. partial rewire 3 bathrooms, and 2- bedroom closets, and a plug to move when in the way of a moved wall. no change in electric meter or service main panel
City of Dallas permitResidential Electrical PermitRough phase: 1. video scope and locate existing sewer main for location of sewer at rear of house. 2. demolition/remove 48sqft of rear patio, dig 2 access holes, and 15' of tunnel for new drain from master toilet to bath #2. 3. install plumbing below slab per plan & connect to existing master toilet branch. includes 2 exterior beam & 4 vertical cores for new plumbing layout. 4. install new drain to master shower from existing tub branch and relocate master toilet drain per plan. 5. water test new slab plumbing for city inspection, remove test after approval, backfill and patch cement. includes pea gravel finish on patio cement. *requires gc supplied dumpster on site for excess spoils and debris. top out phase: 1. install in-wall drain and vent system for new bath #2 and washer, vent through roof as needed. 2. install bath #2 & master shower pan tile drains, rubber liners, and test for leaks. pre-slope cement under liners per city code. 3. install pex water piping overhead for bath #2, master shower (2 valves/3 heads), and master tub from sink cabinet with foam split seam insulation. 4. install in-wall air hammer arrestors at tank type toilets, washer box, and ice maker box. install piping overhead to new ice maker location. 5. plumb double sink in bath #1, install new tub and tub valve, and cap old sink on opposite wall. *gc to relocate hvac condensate from tub to sink. 6. install overhead gas piping from existing attic supply to new kitchen range, master fireplace, and pato bbq locations. test whole system. trim phase: 1. install gc supplied fixtures per fixture schedule and city temp valve in sink cabinet for master tub supply. 2. install tankless wh unit in garage closet at existing tank wh. install capped drip pan with flood stop valve. *gc to provide electrical outlet in closet. *gc to provide and install sinks and cabinets prior to trim install. *gc to provide and install all appliances, plumber to pre-plumb for connection by others
Rough phase: 1. video scope and locate existing sewer main for location of sewer at rear of house. 2. demolition/remove 48sqft of rear patio, dig 2 access holes, and 15' of tunnel for new drain from master toilet to bath #2. 3. install plumbing below slab per plan & connect to existing master toilet branch. includes 2 exterior beam & 4 vertical cores for new plumbing layout. 4. install new drain to master shower from existing tub branch and relocate master toilet drain per plan. 5. water test new slab plumbing for city inspection, remove test after approval, backfill and patch cement. includes pea gravel finish on patio cement. *requires gc supplied dumpster on site for excess spoils and debris. top out phase: 1. install in-wall drain and vent system for new bath #2 and washer, vent through roof as needed. 2. install bath #2 & master shower pan tile drains, rubber liners, and test for leaks. pre-slope cement under liners per city code. 3. install pex water piping overhead for bath #2, master shower (2 valves/3 heads), and master tub from sink cabinet with foam split seam insulation. 4. install in-wall air hammer arrestors at tank type toilets, washer box, and ice maker box. install piping overhead to new ice maker location. 5. plumb double sink in bath #1, install new tub and tub valve, and cap old sink on opposite wall. *gc to relocate hvac condensate from tub to sink. 6. install overhead gas piping from existing attic supply to new kitchen range, master fireplace, and pato bbq locations. test whole system. trim phase: 1. install gc supplied fixtures per fixture schedule and city temp valve in sink cabinet for master tub supply. 2. install tankless wh unit in garage closet at existing tank wh. install capped drip pan with flood stop valve. *gc to provide electrical outlet in closet. *gc to provide and install sinks and cabinets prior to trim install. *gc to provide and install all appliances, plumber to pre-plumb for connection by others
City of Dallas permitResidential Plumbing PermitNsfaa-interior remodel. convert laundry room to bathroom. convert bar to laundry. remodel kitchen and two bathrooms. add gas fireplace in m.bedroom. remove kitchen windows and close up the opening
Nsfaa-interior remodel. convert laundry room to bathroom. convert bar to laundry. remodel kitchen and two bathrooms. add gas fireplace in m.bedroom. remove kitchen windows and close up the opening
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 6423 Wrenwood Dr
What is being built at 6423 Wrenwood Dr?
City of Dallas permits describe a residential interior remodel and later patio work. The records include a 270-square-foot patio cover and electrical work.
When was the remodel at 6423 Wrenwood Dr permitted?
The residential alteration and addition permit was filed September 26, 2025. Its description covers an interior remodel, including changes to the kitchen, bathrooms, laundry room, and bar.
What work is planned for the patio at 6423 Wrenwood Dr?
A July 21, 2026, permit describes a 270-square-foot patio cover with electrical work and 45 square feet of concrete. A separate electrical permit for the patio was filed August 18, 2026.
What other permits were filed for 6423 Wrenwood Dr?
Records include plumbing, mechanical, and electrical permits filed in September and October 2025, along with the later patio permits. The plumbing description covers bathroom and kitchen-related work.
Is a restaurant opening at 6423 Wrenwood Dr?
The permit descriptions provided identify residential remodeling and patio work, not a restaurant buildout or tenant.
How much will the work at 6423 Wrenwood Dr cost?
The records provided do not include a reported valuation or a project-wide cost estimate.
Also being built nearby
All of 75252- 6424 Wrenwood DrSep 17, 2026Sewer repair · 13 m away
- 6432 Wrenwood DrMay 27, 2025Remove existing water heater and haul off. install new 50 gallon gas water heater · 22 m away
- 6404 Wrenwood DrSep 15, 20256ft sewer tunnel · 34 m away
- 6414 Garlinghouse LnMar 25, 2026Removal of existing hvac system and installation of new hvac system · 76 m away
- 18603 Fortson AveAug 11, 202618603 fortson install 22 concrete pilings to stabilize foundation · 92 m away
- 6415 Genstar LnJan 21, 2026Mcr (3rd)third party approved john brusniak: installing a 6.09 kw pv solar system. battery previously installed · 93 m away
- 6423 Genstar LnJun 2, 2025Install 40 gallon gas water heater in 1st floor hall closet (swap out) · 108 m away
- 6400 Genstar LnApr 7, 2026Mcr installation of stone gravity retaining walls · 115 m away
- 6432 Genstar LnMay 12, 2026Install 50 gallon gas water heater in closet · 140 m away
- 18604 Crownover CtOct 22, 2025Install tub · 158 m away
- 18608 Crownover CtMar 27, 2026Gas test · 160 m away
- 6428 Barfield DrJul 6, 2026Install 50 gallon gas water heater in outdoor closet (swap out) · 164 m away