6507 Gretchen Ln
Dallas, TX 75252
6507 Gretchen Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6507 Gretchen Ln, Dallas, TX 75252. The most recent, filed August 1, 2025, covers: “Hvac replacement”.
Compiled from City of Dallas records · updated Aug 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 1, 2025
- since Aug 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6507 Gretchen Ln
What is being built at 6507 Gretchen Ln?
The latest filing (City of Dallas permit RES-MEC-25-001660, August 1, 2025) covers hvac replacement.
How many permits and filings does 6507 Gretchen Ln have?
1 filing across 1 project, from August 1, 2025 to August 1, 2025.
Is there other construction near 6507 Gretchen Ln?
Yes. Nearby filings include 6507 Missy Dr (air test on gas pipe system. ready to be inspected, Aug 13, 2025); 6511 Missy Dr (replace 5 ton furnace, Feb 25, 2026); 6503 Missy Dr (94' - 7' cedar, board on board, 1x4 & 1x2 trim14' - 6' use existing posts1 walk gate2x6 treated baseboard, Jun 3, 2026).
How do I get alerts for new permits at 6507 Gretchen Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 6507 Missy DrAug 13, 2025Air test on gas pipe system. ready to be inspected · 90 m away
- 6511 Missy DrFeb 25, 2026Replace 5 ton furnace · 90 m away
- 6503 Missy DrJun 3, 202694' - 7' cedar, board on board, 1x4 & 1x2 trim14' - 6' use existing posts1 walk gate2x6 treated baseboard · 90 m away
- 6519 Missy DrJan 4, 2026Gas test · 91 m away
- 6428 Gretchen LnJul 21, 2026Replacing water heater in the garage closet · 143 m away
- 6404 Missy DrSep 15, 20266404 missy install 5 concrete pilings to stabilize foundation · 151 m away
- 6423 Gretchen LnJun 2, 2026Complete 5 ton gas system install · 154 m away
- 6507 Camille AveNov 2, 2026Installed one 50 gallon gas water heater · 179 m away
- 6607 Gretchen LnJul 22, 2026Main water line spot repair · 184 m away
- 6400 Gretchen LnFeb 23, 2026Relocation of the main electrical panel and installation of ev charger · 195 m away
- 6407 Camille AveApr 3, 2026Mcr roof-mounted photovoltaic & energy storage system (4.100 kw dc) with (10) panels (1) tesla powerwall 3 (1) tesla backup gateway 3 and 225a msp upgrade with 200a main breaker · 222 m away
- 6615 Missy DrMay 15, 2026Water heater · 228 m away