6605 Hyacinth Ln
Dallas, TX 75252
6605 Hyacinth Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6605 Hyacinth Ln, Dallas, TX 75252. The most recent, filed May 21, 2025, covers: “Foundation repair-install 21 pilings”.
Compiled from City of Dallas records · updated May 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2025
- since May 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6605 Hyacinth Ln
What is being built at 6605 Hyacinth Ln?
The latest filing (City of Dallas permit RES-FDN-25-000044, May 21, 2025) covers foundation repair-install 21 pilings.
How many permits and filings does 6605 Hyacinth Ln have?
1 filing across 1 project, from May 21, 2025 to May 21, 2025.
What is being built near 2400 Daven in Dallas?
6605 Hyacinth Ln is about 117 m from 2400 Daven (17738 Davenport Road). Its latest filing is for foundation repair-install 21 pilings.
Is there other construction near 6605 Hyacinth Ln?
Yes. Nearby filings include 6825 Levelland Rd (electrical no work service release, Apr 6, 2026); 6616 Gold Dust Trl (reroof. remove shingles and replace with owens corning oakridge in color driftwood, May 22, 2025); 6605 Crestland Ave (gas test release, Nov 13, 2026).
How do I get alerts for new permits at 6605 Hyacinth Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 6825 Levelland RdApr 6, 2026Electrical no work service release · 31 m away
- 6616 Gold Dust TrlMay 22, 2025Reroof. remove shingles and replace with owens corning oakridge in color driftwood · 100 m away
- 6605 Crestland AveNov 13, 2026Gas test release · 102 m away
- 6605 Gold Dust TrlAug 24, 2026Replace 5 ton gas hvac unit · 108 m away
- 6609 Gold Dust TrlFeb 9, 2026Wreck and haul off debris from residential structure. scrape lot for positive drainage · 108 m away
- 6619 Crestland AveJun 14, 2026A 2-ton gas air conditioning and heating system was installed · 109 m away
- 6623 Crestland AveOct 2, 2025Add an additional 2 ton complete system and ductwork. r8 ducts. 8 supplies and 1 return. add 3 exhaust fans. add dryer vent duct · 113 m away
- 17738 Davenport Road · 2400 Daven LLCSep 15, 2025Davenport offices — new construction — 2-story office building. 23,000sf · 117 m away
- 17750 Davenport RdSep 25, 2025Shell only qteam meeting 11.20.2025 (1:30 pm) 22,304 sq ft of new 2-story office/showroom warehouse building. shell only · 118 m away
- 6627 Gold Dust TrlNov 12, 2026Installing a permanent kohler 20kw generator & (1) 200amp ats · 120 m away
- 6629 Gold Dust TrlJun 23, 202650 gallon gas water heater installation in hallway closet · 123 m away
- 6635 Crestland AveNov 5, 2025Replacing 50 gallon gas water heater · 129 m away