8460 Pres George Bush Tpke
Dallas, TX 75252
Real estate trade school and generator work at 8460 President George Bush Turnpike
City records describe a new 18,500-square-foot private real estate trade school at this address, with a plumbing permit dated November 14, 2022. Additional permits filed from June 30 to July 21, 2025, cover electrical validation and a natural gas connection for a generator, plus an RPZ test and certification.
Summarized from City of Dallas records · updated Jul 21, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jul 21, 2025
- since Nov 14, 2022
- Largest scope
- —
- Listed value
- $3.5M
- partial · often understated
Permit & project history
4 projectsNew private school of real estate (trade school) including new 18,500 sq ft building and all associated site infrastructure including paving, drainage, wet utilities, and service utilities
New private school of real estate (trade school) including new 18,500 sq ft building and all associated site infrastructure including paving, drainage, wet utilities, and service utilities
City of Dallas permitCommercial Plumbing Permit$3.5M
Sources: City of Dallas
Questions about 8460 Pres George Bush Tpke
What is being built at 8460 President George Bush Turnpike?
A City of Dallas permit describes a new private real estate trade school, including an 18,500-square-foot building and site infrastructure. The permit is dated November 14, 2022.
How large is the new building at 8460 President George Bush Turnpike?
The 2022 permit describes an 18,500-square-foot building for a private real estate trade school.
What are the recent permits for at 8460 President George Bush Turnpike?
City permits filed June 30 and July 21, 2025, cover electrical validation for a 175 kVA natural gas generator and a natural gas connection to the generator. A July 7, 2025, permit covers an RPZ test and certification.
When was the trade school project permitted in Dallas?
The City of Dallas record describing the new trade school building is dated November 14, 2022. Later generator-related permits were filed in June and July 2025.
What is near 8460 President George Bush Turnpike?
Kirby Ice House Plano, at 208 Coit Road, is listed about 581 meters from the address.
Also being built nearby
All of 75252- 8230 Frankford RdJun 24, 2026Carports for the assited living facility. deferred submittal · 149 m away
- 8240 Frankford Rd · Highland Springs Rb 3.4May 27, 2026Qteam qr carports for the apartment building. these were previously on the site plan, but we are now going in for the permit of these. engineered drawings. attached · 151 m away
- 8250 Frankford RdApr 13, 2026Electrical permit for backup generator · 154 m away
- 8000 Frankford Rd · Redwood-Erc Dallas LLCOct 28, 2026Custom interiors scope of work for the combining of tc-509 and tc-511 unit at erickson senior living – highland springs · 250 m away
- 8000 Frankford Road · Redwood - Erc Dallas Llc.Apr 4, 2025Erickson highland springs — new construction — 66,429sf - 2 story new construction addition to existing building · 250 m away
- 3721 Mapleshade Lane · Atmos Energy CorporationAug 5, 2025Atmos mapleshade — renovation/alteration — some site renovation and site lighting updates, security gate for parking. interior office renovation · 508 m away
- 3601 Mapleshade Ln · The Ratliff Group, LLCApr 1, 2025My possibilities sports field restrooms — new construction — new restroom building, warm dark shell · 561 m away
- 3601 Mapleshade Lane · My PossibilitiesJan 15, 2026My possibilities bathroom addition — renovation/alteration — remodel to existing interior space into new restroom and changing room · 561 m away
- 18101 Coit RdAug 26, 2025Sow is to install bollards around the store to protect the customers from vehicular traffic · 577 m away
- 421 Maplelawn Dr · Coit Center (cpl), Blk A, Lot 4; ** Replat **May 13, 2026Dfw aba center — renovation/alteration — interior finish out · 577 m away
- 200 Coit Road · Brixmor Holdings 12 Spe, LLCSep 3, 2026Market plaza renovation — renovation/alteration — demolition and replacement of existing hardscape and landscaping; replacement/remodel of existing building facades; demolition of one existing building. total square footage approximately 80,000 · 579 m away
- 208 Coit Rd · Centro Np Holdings 12 Spe LLCJun 10, 2026Kirby ice house plano — new construction — bar with utility and beverage cooler, kitchen, indoor and outdoor seating areas, restrooms, storage, and office · 581 m away